Similar Projects
Baker Road Water Line Replacement
Infrastructure
Bidding
$4,220,000 est. value
Murfreesboro, TN 37133

Purchase Water Meters
Term Contract
Bidding
Bartlett, TN

Standard Valves
Term Contract
Post-Bid
Chattanooga, TN 37402

36" Dezurik Knife Gate Valves
Post-Bid
Chattanooga, TN 37400

TVA System Operations Center Off-Site Water Line Extension
Results
Chattanooga, TN 37402

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

DMA Stations
Infrastructure
Bidding
$300,000 est. value
Murfreesboro, TN

CDBG 2019 Wastewater Collection Improvements
Post-Bid
Rockwood, TN

Purchase of AMR Style Water Meters
Results
Signal Mountain, TN 37377

Wastewater System Improvements - Collection System Rehabilitation
Infrastructure
Bidding
Mountain City, TN

Moccasin Bend WWTP Equalization Basin And Blower Replacement Improvements
Post-Bid
Chattanooga, TN 37405

2020 Red Bank Sewer Rehabilitation
Results
Red Bank, TN

Installation-Automatic Read Water and Gas Meter System
Infrastructure
Bidding
Pulaski, TN

2018 CDBG Water System Improvements - 5th Street and City Tank Area
Post-Bid
$400,000 to $450,000 est. value
Jellico, TN

Snow Hill Road Force Main Repair Phase 1
Results
Less than $77,850 est. value
Chattanooga, TN

Reported 06/09/2021 12:00 AM
Project Title

Paris Landing Waterline

Physical Address View project details and contacts
City, State (County) Buchanan, TN 38222   (Henry County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $50,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor Shall Provide And Install as Follows A. All Trenching for Water Lines Will Be A Minimum 36 Inches below grade. 1. Sand as needed to bed and cover pipe. 2. Using exiting excavated backfill to top out ditches after sand is used for covering the new pipe. 3. Saw cut one road crossing. 4. Utility’s will be tunneled or bored. 5. Provide a gravel base for roadway and provide 8 inches of concrete for finish. 6. Provide and lay 1700 foot of class 250 water main to 36 inches in depth 7. Provide and lay up to 160 foot of 6-inch class 250 to reconnect 4 branch lines. 8. Provide and install 2- 8 by 8 by 6-inch T’s. 9. Provide and install 1 line tap to a 2-inch fire hydrant line. 10. Provide and install 1-8-inch gate valve. 11. Provide and install 2-6-inch gate valves. 12. Provide and install valve boxes for gate valves. 13. Provide and install 2-inch gate valve for the hydrant. 14. Tracer wire and buried water main caution tape. 15. Work based on 5-day work week 7:00am to 4:30 pm. 16. Testing of system. 17. Reseeding and cover (erosion Control) to be included. 18. One-year warranty on materials and workmanship

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents