Similar Projects
El Cajon Branch Library
New Construction, Infrastructure
Conception
$30,300,000 est. value
El Cajon, CA 92020

Costa Verde Commercial Shopping Center Revitalization
Addition, Demolition, New Construction, Renovation, Infrastructure - 360,000 SF
Design
$170,000,000 CJ est. value
San Diego, CA 92122

Albertsons #0071 / Valley Center
New Construction, Infrastructure - 50,907 SF
Design
$8,000,000 CJ est. value
Valley Center, CA 92082

ADA Pedestrian Ramp and Cold Plane HMA Overlay in Parking Lot
Infrastructure
Post-Bid
$97,220 est. value
San Diego, CA 92111

Pavement Maintenance and Repairs
Alteration
Post-Bid
$700,000 to $800,000 est. value
Solana Beach, CA

Bayshore Bikeway: Barrio Logan Project
Alteration
Results
$15,011,378 est. value
San Diego, CA

SDIA - Airport Administration Building - Site Demolition and Earthwork
Infrastructure
Results
San Diego, CA 92108

Oceanside Fire Station #1
Demolition, New Construction, Infrastructure
Construction
$13,579,000 CJ est. value
Oceanside, CA 92054

Pacific View Academy of Arts Encinitas California
New Construction, Build-out, Renovation, Infrastructure - 15,273 SF
Construction
$2,000,000 CJ est. value
Encinitas, CA 92024

The Trails At Carmel Mountain Ranch
New Construction, Infrastructure
Pending Verification
$450,000,000 CJ est. value
San Diego, CA 92101

Ocean Kamp
New Construction, Infrastructure - 126,400 SF
Pending Verification
$390,000,000 CJ est. value
Oceanside, CA 92054

Airport Road Hotel
New Construction, Infrastructure - 57,500 SF
Design
$21,500,000 CJ est. value
Oceanside, CA 92058

Pavement Rehabilitation
Infrastructure
Post-Bid
$250,000 est. value
Escondido, CA

Cold Plane, RHMA Overlay and HFST, and Fiber Optic Cable
Infrastructure
Results
$30,000,000 est. value
CA

Mission Basin Groundwater Purification Facility (MBGPF) Well Expansion And Brine Minimization Phase 1 - City of Oceanside
Infrastructure
Pending Verification
$3,780,669 CJ est. value
Oceanside, CA 92054

Last Updated 06/29/2023 08:16 AM
Project Title

Eastlake Middle School Shade Structures

Physical Address View project details and contacts
City, State (County) Chula Vista, CA 91914   (San Diego County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $476,100 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project No: PWA #0580 NE Job No: 118-012 Questions from Bidders Due: 5/2/2023 by 2:00 pm All questions about the meaning or intent of the Contract Documents are to be directed via email to the Purchasing Department, at bids@sweetwaterschools.org and copy the Project Manager, Armando Murillo at: Armando.Murillo@sweetwaterschools.org. and the Planning Specialist, Colleen Keeran at: Colleen.Keeran@sweetwaterschools.org. Please provide the project Bid #12-2815-AM and the Project name in the Subject Title of the email. Interpretations or clarifications considered necessary by the District in response to such questions will be issued in writing by Addenda and posted to the District's website at www.demandStar.com. Questions received less than THREE (3) calendar days prior to the date for opening bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. The successful Bidder: (1) shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the Contract for the Work; (2) may substitute securities for any monies withheld by the District to ensure performance under the Contract, in accordance with the provisions of section 22300 of the Public Contract Code; and (3) will be required to certify that it either meets the Disabled Veteran Business Enterprise ("DVBE") goal of three percent (3%) participation or made a good faith effort to solicit DVBE participation in this Contract if it is awarded the Contract for the Work. The Contractor and all Subcontractors shall be paid not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, for the type of work performed and the locality in which the work is to be performed, pursuant to section 1770 et seq. of the California Labor Code. This Project is subject to labor compliance monitoring and enforcement by the Department of Industrial Relations pursuant to Labor Code section 1771.4 and subject to the requirements of Title 8 of the California Code of Regulations. The Contractor and all Subcontractors under the Contractor shall furnish electronic certified payroll records directly to the Labor Commissioner weekly and within ten (10) days of any request by the District or the Labor Commissioner. The successful Bidder shall comply with all requirements of Division 2, Part 7, Chapter 1, Articles 1-5 of the Labor Code. The District shall award the Contract, if it awards it at all, to the responsive responsible bidder based on the base bid amount only. The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. Any bid that is submitted after this time shall be nonresponsive and returned to the bidder. Any claim by a bidder of error in its bid must be made in compliance with section 5100 et seq. of the Public Contract Code. All bids shall be on the form provided by the District. A bid bond by an admitted surety insurer on the form provided by the District, or a cashier's check or a certified check, drawn to the order of the District, in the amount of 10% of the total bid price, shall accompany the Bid Form and Proposal. After the end of the protest period, contractor will be provided with a "Notice of Pending Award" and all contract documents, and request the contractor have contract documents complete, submitted and ready for execution on the Board award date of: June 12, 2023.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents