Similar Projects
Brookhaven Oglethorpe Station Flooring Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Atlanta, GA 30319

Removal and Replacement of Epoxy Floors at Various Parks Locations
Renovation
Sub-Bidding
$84,000 CJ est. value
Dacula, GA 30019

Painting and Flooring Services
Alteration
Post-Bid
Atlanta, Augusta, Cadwell, Claxton, College Park, Columbus, Conyers, Cordele, Dalton, Dawson, Decatur, Eastman, Gainesville, Hampton, Macon, Marietta, Rome, Savannah, Thomasville, Washington, Waycross, GA 31820

Painting and Flooring Services
Alteration
Post-Bid
Atlanta, Augusta, Cadwell, Claxton, College Park, Columbus, Conyers, Cordele, Dalton, Dawson, Decatur, Eastman, Gainesville, Hampton, Macon, Marietta, Rome, Savannah, Thomasville, Washington, Waycross, GA 31820

Carpet Replacement for Moody AFB Fire Station - Building 621
Results
Moody Air Force Base, GA

Fluid Applied Resilient Flooring Replacement Services
Alteration
Results
Winder, GA 30680

Lost Mountain Middle School Flooring Replacement
Renovation
Construction
$1,290,810 CJ est. value
Kennesaw, GA 30152

Garrison Mill Elementary School Flooring Replacement
Renovation
Construction
$553,600 CJ est. value
Marietta, GA 30062

78--Supply and Install Gym Flooring
Alteration
Post-Bid
Savannah, GA 31405

Polk School District Gym Floors
Alteration
Results
GA

Public Works Building Renovation
Renovation
Post-Bid
Canton, GA 30114

Floor Stripping and Waxing
Alteration
Results
Cedartown, GA

Garrett Middle School Gymnasium Floor Replacement
Alteration
Post-Bid
Austell, GA 30106

Carpet Installation Soar And Elam
Alteration
Results
$40,000 est. value
Macon, GA 31204

Due West Elementary School Flooring Replacement
Alteration
Post-Bid
Marietta, GA 30064

Last Updated 06/29/2023 03:08 PM
Project Title

Fleet Maintenance Shop Floor Renovation

Physical Address View project details and contacts
City, State (County) Cumming, GA 30028   (Forsyth County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $95,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

It is the responsibility of the Bidder to ensure examination of the bid documents and site and to submit any questions / requests for clarification as directed within the Bid Documents. No Bidder may withdraw his Bid within 90 days after the actual date of the opening, thereof. Forsyth County, Georgia hereby gives public notice that: "It is our policy to assure compliance with Title VI of the Civil Rights Act of 1965, the Civil Rights Act of 1987, and related statutes and regulations in all programs and activities." Award of bid will be made at a later date. The Board of Commissioners reserves the right to reject any or all bids. B No Questions will be accepted after: June 14th , 2023, 12:00 PM (EST) All questions are to be asked via Bonfire under Opportunity Q&A ID SPECIFICATIONS o Provide a complete Fleet Maintenance Floor Renovation (Approximately 8900 sq. ft.) LOCATION: 4140 County Way Rd, Cumming, GA 30028 The scope of work for the Forsyth County Fleet Maintenance Floor renovation is per the attached specifications from SherwinWilliams, Section 096723 - Resinous Flooring. The Contractor shall provide all materials, equipment, and labor for the Fleet Maintenance Shop Floor renovation per the specifications from Sherwin Williams for the resinous flooring. The Fleet Maintenance shop will be working during this renovation. This project shall be completed in a three (3) Phase, one (1) mobilization time frame. Coordination of one day, on Mondays, will be required to allow movable equipment to be removed from the next work phasing area. All equipment to be moved is the responsibility of the Fleet Shop. The area to be worked on will be free and clear of all moveable equipment for the work to continue. A schedule is required with the submission of the bid to include one day, on Mondays, to move equipment between phases. This will be a total of two moving days allowed. OSHA Compliant Dust Control Measures must be followed, 1926.1153. A temporary plastic containment curtain shall be required between areas of the phased work to help with the dust control. The area will be free of all traffic and activity during installation and for 24 hours after completion of each phase.

Details

8,900 SF.
Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents