Similar Projects
Last Updated | 06/21/2023 12:32 AM |
Project Title | Lining of Stormwater Drainage Pipe |
Physical Address | View project details and contacts |
City, State (County) | Cape Coral, FL 33993 (Lee County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $210,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City reserves the right to reject any or all bids/proposals in whole or in part and to waive any irregularities or informalities when in the best interest of the citizens of the City of Cape Coral. Furnish all labor, material, equipment and operations necessary to line, only by cured-in-place pipe lining method, approximately 8,330 linear feet (throughout the entire City) of deteriorated stormwater drainage pipe ranging in diameter from 15 inches to 72 inches. The lining operation may consist of all or part of the following: A. Excavating and exposing junction boxes. B. All maintenance of traffic. C. Pipe cleaning. D. Video taping. E. Delivery of material to site. F. Clean-up of job site. G. Sod where required. The depth of each pipe size that may require a point repair excavation is 5 to 15 feet. At any time during the term of this Contract or any renewal thereof, a City representative may request to add additional pipe sizes to the contract on an as needed basis. Question Cutoff Date: 6/7/2023 03:00 PM (ET) |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |