Similar Projects
Upgrade Building 504 Fire Detection and Install Fire Suppression
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Camp Douglas, WI

Replace Airfield Fire Pump, Fort McCoy WI
Renovation, Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Fort McCoy, WI 54656

Downtown Main Campus (DMC) Fire Protection Improvements FH 5-8
Alteration
Bidding
$750,000 est. value
Milwaukee, WI 53203

Repair Bulk Oxygen Alarm System
Renovation, Term Contract
Post-Bid
$25,000 to $100,000 est. value
Tomah, WI 54660

MEPF Design Assist for East, West and Capital High Schools
Alteration
Post-Bid
Madison, WI 53704

Fire Protection System
Results
Waterford, WI 53185

Fire Protection Services
Results
WI

Transit Center Concourse Ceiling Replacement
Alteration
Bidding
$750,000 est. value
Waukesha, WI 53188

Barron County Justice Center Fire Alarm System
Alteration
Post-Bid
Barron, WI 54812

Simplex Fire Alarm Panel and Connection
Results
WI

Fire Suppression Inspections and Repairs
Term Contract
Bidding
Oshkosh, WI

Upgrade Bldg 504 Fire Detection And Suppression
New Construction
Post-Bid
Camp Douglas, WI 54618

Fire And Ems Station Solar PV System
Renovation
Results
Jefferson, WI

Time and Material Behavioral Health Division - Fire Protection
Alteration
Post-Bid
Wauwatosa, WI 53226

Fire Escape Repairs - Various Sites
Alteration
Results
Milwaukee, WI 53206

Reported 07/01/2022 12:00 AM
Project Title

Tomah VA Fire Department Full Service Preventative Maintenance at the Tomah VAMC

Physical Address View project details and contacts
City, State (County) Tomah, WI 54660   (Monroe County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide all equipment, material, labor, travel costs and supervision, to perform all necessary preventative maintenance, testing and certification, of the systems noted here. Kitchen hood suppression systems. Clean agent fire suppression system. Wet and dry sprinkler systems. Anti-Freeze fire sprinkler loops. Wet sprinkler system backflow preventers. Fire extinguishers. Fire alarm panel backup batteries. Fire alarm panel radio transmitters and receiver s backup batteries.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents