Similar Projects
Replace the Bridge Carrying Albers Lane Over Rocky Branch Creek in Bethalto
New Construction, Infrastructure
Bidding
Bethalto, IL

Mack Road Multi-Use Path and Bridge Reconstruction
Post-Bid
$250,000 to $500,000 est. value
Warrenville, IL 60555

Lincoln Yards - Dominick Bridge
New Construction
Post-Bid
$35,000,000 est. value
Chicago, IL 60601

Harmony Road Bridge Repairs
Renovation
Results
$93,995 est. value
Marengo, IL 60152

Bridge Beam Replacement for SN 016-0825 Carrying Church St Over I-94
Results
IL

Elim Bridge Replacement
New Construction, Demolition
Construction
Crestwood, IL

I-20-4722 Bridge Construction O`Hare To Westbound Il Rt 390 Ramp
Post-Bid
Less than $10,000,000 est. value
Downers Grove, IL 60515

Removal and Replacement the Bridge Superstructure, Raising Roadway Profile on Joliet Road Over Flag Creek in the Village of Indian Head Park and Burr Ridge
Results
Indian Head Park, IL 60525

Replace the Bridge Carrying CH 20 Over Quiver Creek and Roadway Reconstruction, Located 4.0 Miles Northeast of Havana
Post-Bid
Havana, IL

Permanent Protective Shield Installation on Il 53 Bridges Over Il 62, US 14 and Rr, Palatine Rd, Kirchoff Rd, Anderson Dr, as Well as Fulton Market St Bridge Over I-90/I-94
Results
IL

Bituminous Letting: Bituminous Blade Mix (M17-08) - 6,414 Tons
Post-Bid
Paris, IL

(0.019MI) Bridge Superstructure Repair Over Flint Creek Tributary
Results
Barrington, IL 60011

I-19-4449 I-294 Roadway and Bridge Widening and Rehabilitation
Post-Bid
Downers Grove, IL

Partial Beam and Deck Replacement on the Bridge Carrying Sibley Blvd
Results
Dolton, IL 60419

Single Span Bridge
Renovation
Post-Bid
McLeansboro, IL

Last Updated 09/06/2021 09:25 AM
Project Title

Single Span Bridge Replacement Including Removal

Physical Address View project details and contacts
City, State (County) Canton, IL   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Single Span Bridge Replacement Including Removal Of Existing Single Span Pcc Deck Beam Superstructure On Timber Pile Closed Abutments With Timber Lagging And Concrete Caps (33 Ft Bk To Bk, And 26 Ft O To O Deck, 30 Degree Skew); And Constructing Proposed Single Span 33" Pcc Deck Beam Superstructure On Concrete Spill Through Abutments (82 Ft Bk To Bk, And 27 Ft O To O Deck, 30 Degree Skew), With Hp 10x42 Steel Piles; And All Other Related Work To Complete The Section.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents