Similar Projects
Design Build Services for Academy Corridor Isolation Valves Replacement Project
Infrastructure
Bidding
Colorado Springs, CO

Water Distribution Repair and Replacement
Infrastructure
Bidding
Monument, CO

Woodmen Hills West Water Pipeline
Post-Bid
Peyton, CO 80831

Monument Valley Park Water Utility Construction
Post-Bid
Colorado Springs, CO 80903

Butterfly, Gate, and Tapping Valves
Term Contract
Results
Colorado Springs, CO

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

New Fire Station Utility
Construction
Falcon, CO 80831

Monument Raspberry Lane Street and Waterline Improvements
Post-Bid
Monument, CO 80132

All Division Horizontal Directional Drilling Services
Results
Colorado Springs, CO 80947

Northern Regional Water Delivery Project Segment D
Infrastructure
Post-Bid
Monument, CO

Boddington Field Water Utility Construction
Results
Colorado Springs, CO

6-Inch CIP Water Main Lining
Infrastructure
Post-Bid
Colorado Springs, CO 80900

Clarksley Road and Mountain View Road Sanitary Sewer and Water Main Replacement
Results
Manitou Springs, CO 80829

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Centralized Treatment Raw Water Line
Results
$300,000 to $350,000 est. value
Colorado Springs, CO 80906

Last Updated 09/23/2021 11:44 AM
Project Title

A-1 Well Equipping

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80910   (El Paso County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be performed generally includes the supply of step-up transformer, VFD drive, pump and motor, drop pipe, downhole level transducer, monitoring control conduit, check valves, and power cable. The adjustment of the existing pitless adaptor discharge elevation and direction. Install 20 LF of 6” DIP connecting pitless to existing raw water main. Obtain all necessary electrical permits. Provide and install and necessary conduit, wiring, and other necessary electrical implements. All incidental work, equipment, implements, labor, transportation, construction equipment, machinery, tools, appliances, fuel, power, light, heat, telephone, water, and sanitary facilities required for installation of the noted equipment for work required to complete the project documents.

Details

Division 26 - Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents