Similar Projects
Y--La Posa North Prefab & Installation of Double Vault Toilets with Chase.
Results
Quartzsite, AZ

Y--Virgin River CG Restroom Renovations Construction
Results
$380,000 to $550,000 est. value
AZ

Park Renovation Project
Renovation
Results
$37,850 to $133,962 est. value
Surprise, AZ

Monte Vista Village Resort
Renovation - 1,283 SF
Construction
$75,043 est. value
Mesa, AZ 85209

Tesoro at Greenfield - Restroom
Renovation - 161 SF
Post-Bid
Mesa, AZ 85206

Three Points Shooting Range Restroom Improvements
Renovation
Results
$300,000 est. value
Tucson, AZ

Costco #738 - Restroom Remodel
Renovation, Demolition - 911 SF
Construction
$250,000 est. value
Phoenix, AZ 85050

Pop Harvey Park Restrooms Rehabilitation
Results
Less than $200,000 est. value
Parker, AZ 85344

DEMA M5101 Air Guard Latrine (M20-0015) Single
Results
Less than $100,000 est. value
Phoenix, AZ 85008

Gaines Park Baseball Field Construction
Results
Surprise, AZ 85374

FMS 7 Latrine Remodel Project
Renovation
Results
Less than $200,000 est. value
Phoenix, AZ 85008

Red Mountain Park Expansion
Results
$225,000,000 est. value
Mesa, AZ 85207

Restroom Remodel
Renovation
Post-Bid
Yuma, AZ 85364

Sells Shell Convenience Store D-B Restroom Remodel
Renovation
Post-Bid
Sells, AZ 85634

Construction of the Mountain Valley Park Restroom
Post-Bid
Prescott Valley, AZ 86314

Last Updated 11/25/2020 03:41 PM
Project Title

Burro Creek Restroom Renovation

Physical Address View project details and contacts
City, State (County) Wikieup, AZ   (Mohave County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Bureau of Land Management (BLM) has a requirement for a restroom renovation. This project is located in Wikieup, AZ. Selective demolition to include removal of existing, mirrors, plumbing fixtures, toilet partitions, piping as required, toilet partitions, restroom accessories, drinking fountains, light fixtures, doors and hardware and portions of existing wall to extents shown on construction documents. Installation of new roof as shown on the construction documents, new doors and hardware, new flooring, new toilet partitions and urinal screens, new mirrors, new lighting fixtures, new restroom accessories, new plumbing fixtures including new drinking fountains per the construction documents. Project also includes installation of several photovoltaic array systems.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents