Similar Projects
Snow Removal Services, Cargo Inspection Facility, Detroit, MI
Design
Detroit, MI 48216

Snow Blowing and Snow Removal Services
Post-Bid
Sault Sainte Marie, MI 49783

Seasonal Snow Removal
Post-Bid
Mount Pleasant, MI

Snow Removal for DEQ 635 Filley Street District Office
Results
Lansing, MI

Waste Disposal and Recycling Services
Results
Less than $60,000 est. value
Wayne, MI

2019-2020 Snow Removal
Post-Bid
Niles, MI

Lawn Mowing/Snow Removal
Results
Less than $1,860 est. value
Port Huron, MI

Snow Removal and Ice Management Services for the 2019/2020 Snow Season for the Romulus Athletic Center.
Term Contract
Post-Bid
MI

Dart Auditorium-Fire Curtain And Rigging Replacement
Results
Pinckney, MI

Snow Removal Services - Multiple Sites
Post-Bid
Detroit, MI

Property Maintenance
Term Contract
Results
Kalamazoo, MI

Bridge Icicle Removal
Term Contract
Post-Bid
MI

Neighborhood Stabilization Program - Right of First Refusal
Results
Garden City, MI

Hillman Fire Department Snow Removal
Post-Bid
Hillman, MI 49746

Aqueous Film Forming Foam (Afff) Collection and Disposal
Results
Lansing, MI

Last Updated 07/22/2020 09:33 AM
Project Title

Barn Dismantling and Salvage

Physical Address View project details and contacts
City, State (County) Alto, MI 49302   (Kent County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Barn dismantling and salvage at the approximate location of 10291 Whitneyville Ave SE, Alto MI 49302 The work includes the following: 1.Respondent must have the capability to break down the barn and remove any debris that will not be salvaged in accordance with generally accepted demolition practices and procedures; 2.Respondent must stack and bundle salvageable material which includes the wood and metal roofing for transport; 3.Respondent will be required to obtain permits, if necessary; 4.Removal of trees and shrubs if contractor deems it necessary to facilitate dismantling of barn; 5.Use existing soil to return grade to a natural condition;

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents