Similar Projects
Ramblewood Pumping Station Valve Replacement
Infrastructure
Bidding
$92,000 est. value
Mount Laurel Township, NJ 08054

Well 5A PFOS Treatment System Upgrade
Renovation, Infrastructure
Bidding
$3,500,000 est. value
Willingboro, NJ

Well 11 Improvements
Post-Bid
Livingston, NJ

Pilot Boring/Monitoring Well Construction and Water Quality Sampling
Post-Bid
East Windsor, NJ 08520

Electrical and Mechanical Maintenance, Servicing and Repair of Potable Water Wells, Pumping and Related Facilities
Results
Cedar Knolls, NJ 07927

J Street Well House Upgrades
Results
Seaside Park, NJ 08752

DDTH Pumping Station Project
Construction
Kearny, NJ 07032

Well No. 7 Building
New Construction, Infrastructure
Construction
$2,000,000 est. value
Evesham, NJ

Groundwater Containment Treatment System - Sump Pumps
Term Contract
Pending Verification
Boonton, NJ

Speed Bump Installation
Infrastructure
Bidding
Irvington, NJ

Water and Sewage Pump Maintenance and Repairs
Post-Bid
Wayne, NJ 07470

2020 Redevelopment of Well No. 10
Results
Margate City, NJ 08402

Well No 10 Treatment Facilitiy
Infrastructure
Bidding
Seaside Park, NJ

Poplar Avenue Sewage Pump Station Rehabilitation
Renovation
Post-Bid
Linwood, NJ 08221

Furnish Various Spare Parts for Worthington Pumps
Results
Bayville, NJ 08721

Last Updated 03/31/2022 12:59 PM
Project Title

Schwing Bioset Pump Replacement

Physical Address View project details and contacts
City, State (County) NJ   (Bergen County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this Contract consists of disconnecting and removing and disposal of existing screw feed, pump, power pack, control panel and appurtenances and unloading, rigging and installing and connecting new Owner furnished screw feed, pump, power pack, control panel and appurtenances. The new control panel is to be mounted on the opposite corner of the room from the existing panel. The work also includes new pump transition piping, relief drain valves, new 300 lb. ball valves, new press discharge hopper and appurtenances. The work includes mechanical as well as electrical work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents