Similar Projects
Pre-Qualification for 2021 City Infrastructure Improvement Projects
Bidding
Rochester, NH

Lining Services for Sewer Siphon
Bidding
Less than $175,000 est. value
Hudson, NH

2020 Catch Basin Cleaning
Post-Bid
Atkinson, NH

Wastewater Utility Service FCI Berlin - 120 Months
Post-Bid
Berlin, NH 03570

2019 Sewer Replacement
Results
Goffstown, NH

Underground Utilities Cowper Road
Results
Wolfeboro, NH

2021 Sewer Main Lining Project
Bidding
Lebanon, NH

Catch Basin Cleaning
Post-Bid
Rye, NH

Woodman Road Sewer Replacement
Results
Durham, NH

Catch Basin Cleaning Services
Term Contract
Bidding
Raymond, NH

2021 Catch Basin Cleaning
Term Contract
Post-Bid
Atkinson, NH

Catch Basin Cleaning and Inspection Services
Results
Somersworth, NH

Water and Sewer Utility Improvements
Post-Bid
Less than $4,600,000 est. value
Newmarket, NH

2019-2020 Highway Department Items - Catch Basin Cleaning
Term Contract
Results
Pelham, NH

Strafford Square Utility Relocation Project
Post-Bid
Rochester, NH

Last Updated 01/17/2020 10:11 AM
Project Title

Elaine Street Improvements

Physical Address View project details and contacts
City, State (County) Hampton, NH   (Rockingham County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all personnel, labor, materials, equipment, and means for the construction of the sewer and drainage replacement project along Elaine Street from Winnacunnet Road to Richard Street. The work includes but is not limited to the following: Excavation, earthwork, removal of old piping/structures, by-pass sewer pumping, dewatering (if necessary), installation of a new 8” sewer main, installation of four (4) sewer manholes, installation of sixteen (16) sewer services and cleanouts to the outer edge of the right-of-way line, installation of a new 12” HDPE drainage main, installation of four (4) catch basin, installation of backfill, compaction, testing, temporary trench patching, loam, seeding, grading, liming, fertilization, mulching, and watering of any disturbed areas, traffic control management and all other items incidental to the whole construction.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents