Similar Projects
Concrete Cutting Services
Term Contract
Post-Bid
zh, CA 93510

Annual Residential Street Rehabilitation Project (Phase 2B)
Term Contract
Post-Bid
Compton, CA 90221

Construction of Concrete Improvements in Residential Streets
Alteration
Results
Cerritos, CA

Place Minor Concrete and Highway Plants
Alteration
Results
$3,850,000 est. value
Los Angeles, CA 90081

City Hall Restroom Renovation
Renovation
Construction
$66,000 CJ est. value
Paramount, CA 90723

Portland Cement Concrete Materials (As-Needed)
Term Contract
Post-Bid
$35,000 est. value
Palmdale, CA

Outdoor Gym Concrete
Alteration
Results
$100,000 est. value
Lancaster, CA 93536

RFQ Contractor - Belmont Beach and Aquatics Center
Demolition, New Construction, Infrastructure - 90,480 SF
Post-Bid
$70,000,000 CJ est. value
Long Beach, CA 90803

Install Plants, Irrigation, and Prepare and Stain AC and Concrete
Alteration
Results
$830,000 est. value
City of Industry, CA 91714

Asphalt Concrete Cement
Infrastructure
Post-Bid
Pasadena, CA

Prepare and Stain Concrete
Alteration
Results
$640,000 est. value
Los Angeles, CA

Parkway Concrete Maintenance, Maintenance District 4
Alteration
Post-Bid
$2,500,000 est. value
Los Angeles, CA

Individual Slab Replacement
Alteration
Results
$2,800,000 est. value
Long Beach, CA 90810

Parkway Concrete Maintenance, Maintenance District 2
Term Contract
Post-Bid
Los Angeles, CA 90012

Place Minor Concrete and Hot Mix Asphalt
Infrastructure, Alteration
Results
$2,750,000 est. value
Long Beach, CA 90899

Last Updated 10/12/2023 10:43 AM
Project Title

San Gabriel River Greenway and Neighborhood Connection

Physical Address View project details and contacts
City, State (County) Baldwin Park, CA 91706   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,929,499 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

2.3 mile bike-way/pedestrian path along the San Gabriel River and Walnut Creek Wash The City reserves the right to reject any and all bids and to waive minor irregularities In accordance with the provisions of Sections 1770 et seq., of the Labor Code, the Director of the Industrial Relations of the State of California has determined that the general prevailing rates of wages are applicable to the work to be done. Q&A Deadline 08/29/2023 6:00 PM (PDT) The cost estimate for base bid is $2,210,686.70 and the for the additive alternate is $2,083,876.00 Project will be awarded in September, and construction is anticipated to start in March of 2024

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents