Similar Projects
Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

London Crossing
New Construction, Infrastructure - 32,600 SF
Design
$11,000,000 CJ est. value
Wheeling, IL 60090

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Roadway Pavement Rehabilitation
Infrastructure
Post-Bid
Hoffman Estates, IL

2020 CDBG Street Improvements
Infrastructure
Post-Bid
Country Club Hills, IL

Burley ES - LBP Mitigation and ACM Patch & Repair in the Ventilation System
Term Contract, Infrastructure
Results
$29,725 CJ est. value
Chicago, IL 60657

2022 Sidewalk and Concrete Maintenance
Results
Palatine, IL 60067

Lincoln Yards South Package A-1 & B
Construction
Chicago, IL 60632

Auburn Park Station & Parking Facility
New Construction, Alteration - 4,678 SF
Construction
Chicago, IL 60620

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

Foundry
New Construction, Infrastructure - 13,100 SF
Design
$163,000,000 CJ est. value
Chicago, IL 60607

Asphalt Parking Lot Removal & Replacement
Demolition, Alteration
Post-Bid
$300,000 est. value
Lansing, Tinley Park, IL 60438

McCook and Thornton Reservoirs Rock Wall Stabilization and Geotechnical Instrumentation
Renovation
Results
$8,460,000 to $10,250,000 est. value
Bedford Park, IL 60501

Lake Street Office
New Construction, Infrastructure - 67,600 SF
Construction
$16,600,000 CJ est. value
Chicago, IL 60607

Last Updated 01/04/2023 02:03 PM
Project Title

Designed Overlay and ADA Improvements

Physical Address View project details and contacts
City, State (County) Chicago, IL 60641   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

(4,569 Ft) Designed Overlay and ADA Improvements located in the City of Chicago in Cook County. Addison Street from Avondale Ave to Sacramento Ave. Region 1 District 1 Federal Project STPBBYL(553) County(s) Cook Key Route(s) FAU 1372 Marked Route(s) ADDISON STREET Section(s) 2018-019-RS-SW State Job #(s) C-91-255-18 PPS #(s) 1-79611-0000 Contract Specifics - 50 Working Days Questions not accepted as of April 19, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 08, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 124 - Designed Overlay and ADA Improvements

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents