Similar Projects
Magnolia Drive Phase II Project From Judita Drive To Sunflower Drive - City of Brunswick
Infrastructure
Conception
$1,000,000 CJ est. value
Brunswick, OH 44212

Storm Water Improvements at Healey Creek and Lares Lane-Holly Drive - City of Brunswick
Infrastructure
Conception
$250,000 CJ est. value
Brunswick, OH 44212

New High School - Brunswick City Schools
New Construction, Renovation, Infrastructure - 285,000 SF
Design
$109,000,000 CJ est. value
Brunswick, OH 44212

US 42 - Roadway Major Rehab
Infrastructure
Design
$7,701,100 CJ est. value
Medina, OH 44256

Renovation of 543 East Washington Street Bid Package 4
Renovation, Addition, Infrastructure - 6,900 SF
Post-Bid
$851,900 est. value
Medina, OH 44256

Fenn Tennis Court Replacement
Renovation
Post-Bid
$455,000 est. value
Medina, OH 44256

T.H. 357 Valley Brook Boulevard Replacement Project
Infrastructure
Results
$549,835 CJ est. value
Hinckley, OH 44233

MED-CR 35-1.79 Friendsville Road Bridge Rehabilitation Bridge No. 8 (Rebid)
Infrastructure
Results
$1,156,341 CJ est. value
Lodi, OH 44254

Forest Glen
Infrastructure
Construction
$12,900,000 CJ est. value
Lafayette Township, OH 44256

Liberty View
New Construction, Infrastructure - 9,100 SF
Pending Verification
$9,300,000 CJ est. value
Medina, OH 44256

Hillsong Residences
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Lafayette Township, OH 44256

Improvement at Neura Park - City of Brunswick
Infrastructure
Conception
$250,000 CJ est. value
Brunswick, OH 44212

Court Street Hotel
New Construction, Infrastructure - 12,784 SF
Design
$23,700,000 CJ est. value
Medina, OH 44256

Park Improvements - Fountain Repair and Playground Equipment Installation
Renovation
Post-Bid
$142,000 est. value
Lodi, OH

MED-CR 35-1.79 Friendsville Road Bridge 8 Replacement - Superstructure Demolition, Substructure Rehabilitation, and Construction Inspection
Demolition, New Construction, Infrastructure
Results
$1,156,341 CJ est. value
Lodi, OH 44254

Last Updated 09/16/2023 10:01 AM
Project Title

Design-Builder for Medina County Park District Allardale Park Playscape Design and Development Project

Physical Address View project details and contacts
City, State (County) Medina, OH 44256   (Medina County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Design-Build Firm to Subcontract, Competitive Bids
Project Status Accepting Qualifications, Request for Qualifications, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $330,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

MCPD is looking to create additional park amenities on approximately 7 acres of this highly visible site along Remsen Road in Granger Township. In this area, MCPD seeks to construct a natural play area, approximately 0.3 miles of trails, and passive recreation amenities for this existing park. The intent of the project is to provide a combination of education and play for children to engage with the natural environment including trails and planting areas that mimic the historic terraced farming which used to take place here. The construction activities identified for this project include creation of natural play features, accessible trails that meet ADA standards, and utilizing native plantings within the designated site. The Design-Builder will be responsible for the design, permitting, geotechnical evaluation and conditions, historic and cultural resource management, and for locating all utilities prior to commencing work. The Design-Builder will be responsible for providing all information and for securing, on behalf of MCPD, all necessary state, local, and federal permits for the project. This includes all required surveying and data collection to prepare and submit permit applications and payment of all required fees to obtain permits or agency authorizations to proceed. No work shall be commenced until the permits are secured and final review has been approved by MCPD. The Design-Builder shall observe and comply with all legal requirements in the performance of the work. Design-Builder will be responsible for all modifications to the site including, but not limited to, construction access and staging, trails, landscaping, playscape creation, trailhead creation, drainage improvements, and utility relocations. Following construction completion, as-built drawings must be provided by the Design-Builder. The scope of work shall be to provide Design-Build services to construct approximately seven acres of multiuse play and passive recreation amenities including a natural play area, trails, and terraced planting areas. All questions concerning the project must be submitted no later than Tuesday, October 10, 2023 at 4:30 p.m. to Park Planner John Kleshinski at jkleshinski@medinaco.org or 330-722-9385.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents