Similar Projects
Hampton Inn & Suites Hotel & Conference Center
New Construction - 71,987 SF
Construction
$13,000,000 est. value
Speedway, IN 46224

Chore Time Brock Upgrades Facilities
New Construction - 42,900 SF
Construction
$20,000,000 est. value
Milford, IN 46542

General Construction - Raper Expo Center
New Construction
Post-Bid
Richmond, IN

ICC Elevator and Escalator Modifications
Renovation
Post-Bid
$300,000 est. value
Indianapolis, IN 46225

The RV/MH Hall of Fame Convention Hall
New Construction - 36,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Elkhart, IN

Grand Millennium Center
New Construction, Infrastructure - 350,000 SF
Design
$200,000,000 CJ est. value
Westfield, IN 46074

Event Center - Saint Mary Of The Woods College
New Construction, Infrastructure
Conception
$1,500,000 est. value
IN 47876

Odd Fellows Building Redevelopment
Build-out - 82,565 SF
Design
$25,000,000 CJ est. value
Indianapolis, IN 46204

Memorial Opera House And Porter County Museum
Renovation
Design
$6,500,000 CJ est. value
Valparaiso, IN 46383

Monroe Convention Center Expansion
Addition, Demolition, Renovation, Infrastructure - 60,000 SF
Design
$44,000,000 CJ est. value
Bloomington, IN 47403

Westgate Academy Facility - Tenant Improvements
Renovation - 17,000 SF
Post-Bid
$247,409 CJ est. value
Odon, IN 47562

RFQ Construction Manager - East Chicago Capital Project - Renovation and Infrastructure Improvements
LEED Certification, Renovation, Infrastructure
Post-Bid
$12,249,371 CJ est. value
Indianapolis, IN 46204

Last Updated 02/21/2023 12:22 PM
Project Title

NW 827 - Anderson Library Conference Center First Floor Renovation (C.U.R.E. Department)

Physical Address View project details and contacts
City, State (County) Gary, IN 46408   (Lake County)
Category(s) Entertainment/Recreation, Green Building
Sub-Category(s) Convention/Exhibit Center, LEED Certified
Contracting Method Competitive Bids
Project Status Construction complete as of October 2022 , Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $127,446 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 2, 2022, construction has been completed, however, an exact timeline for construction has not been confirmed. A Unified Bid is requested for all work in this project, including General Construction work. The Contractor shall perform all labor, furnish all materials and equipment necessary to complete the contract for all work, Anderson Library Conference Center Second Floor Renovation First Floor Renovation renovation of the anderson library and conference center first floor reserve book shelving and circulation desk accessory spaces into a new enclosed group instruction room for use of the center for urban and regional excellence. the program includes seating at tables for 22 persons. one receptionist and two staff members bring the total staff to 25. the reserve book area has been moved east and revised bookshelving locations are depicted. a new entry into the cure space is through a new corridor east from the existing main lobby. the new cure open space is 945 sf. the condensed reserve space is 693 sf. two existing offices (south wall) remain and a storage nook is shown. total area of work is 3,102 sf. P.No- IUN20220401 NW 827, IUN20220331 NW 827 See project specifications for electronic bid submission instructions. All bid proposals shall be in full accord with the Bidding Documents, which are on file with the Owner and may be examined by prospective Bidders: VPCPF Support Resources - Construction Procurement Indiana University bidtab@indiana.edu 812-855-5294 Each bid must be accompanied by: a completed Minority, Womens and Veterans Business Enterprise Participation Plan, detailing the good faith efforts of the contractor to include minority, women and veteranowned enterprises as subcontractors or material suppliers on the Project; a bid security for 5% of the total bid; and the contractors written drug testing program, which must be in full compliance with IC 4-13-18. The Owner reserves the right to accept or reject any bid and to waive any irregularities in bidding. The Owner may consider a bid to be incomplete if it does not provide the required documentation as described in this Notice, including but not limited to the Minority, Womens and Veterans Business Enterprise Participation Plan. The Base Bid may be held for a period not to exceed sixty days before awarding Contracts. All Alternate Bids may be held for a period not to exceed ninety days before award and incorporation into the contract by proper Change Directive. Should a successful Bidder withdraw his bid, or fail to execute a satisfactory Contract within ten days after notice of acceptance of bid, the Owner may declare the Bid Security forfeited as liquidated damages, not as penalty *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

1 Story Above Grade, 3,102 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents