Similar Projects
Last Updated | 01/08/2021 12:02 PM |
Project Title | County Road 488 (CR488) Guardrail Improvement Project |
Physical Address | View project details and contacts |
City, State (County) | FL (Citrus County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $121,033 |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Removal of approximately 445 feet of existing guardrail (presently in poor conditions) in two locations along CR 488 between US 19 and east of Chaubad Terrace. Both sites/locations include both conventional guardrail removal from existing ground surface, as well as guardrail removal from sections attached to the endwalls of existing box culvert crossings. Included in the guardrail removal is grinding existing hardware off of existing concrete, grout cap repair, and all ancillary guardrail hardware from the existing culvert locations. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |