Similar Projects
Clear Creek Bike Path Connector - State of Ohio
Infrastructure
Conception
$732,000 CJ est. value
Paint Township, OH 45133

Roadway Minor Rehab
Infrastructure
Conception
$4,383,081 CJ est. value
Paint Township, OH 45133

SR 138 - Bridge Deck
Infrastructure, Renovation
Design
$2,300,000 CJ est. value
Hillsboro, OH 45133

US 50 - Two Lane Resurfacing
Infrastructure
Bidding
$1,334,702 CJ est. value
Rocky Fork Point, OH 45133

Sycamore Circle Drainage Improvements
Infrastructure
Bidding
$175,200 CJ est. value
Greenfield, OH 45123

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Asphalt Leveling Coarse
Infrastructure
Post-Bid
$500,000 CJ est. value
Lynchburg, OH 45142

New Market Elevated Tank Repainting
Renovation, Infrastructure
Results
$796,500 CJ est. value
Hillsboro, OH 45133

North West Street Waterline Improvements
Alteration
Results
$2,150,000 est. value
Hillsboro, OH 45133

Family Dollar / Hillsboro
New Construction, Infrastructure - 10,431 SF
Construction
$500,000 CJ est. value
Hillsboro, OH 45133

Dodson Creek Solar
Alteration
Pending Verification
$117,000,000 est. value
Hillsboro, OH 45133

Dollar General / New Market
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
New Market, OH 45133

Level Coating
Infrastructure
Post-Bid
$200,000 CJ est. value
Hillsboro, OH 45133

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Dollar General #24897 / Hillsboro
New Construction, Infrastructure - 10,640 SF
Post-Bid
$2,800,000 CJ est. value
Hillsboro, OH 45133

Last Updated 07/20/2023 05:44 PM
Project Title

High Street Lead Service Line Replacement

Physical Address View project details and contacts
City, State (County) Hillsboro, OH 45133   (Highland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work shall consist of furnishing all labor, materials, and equipment in accordance with the contract documents. Project cost estimate is $900,000.00. Each bid shall be accompanied by a Bid Guaranty and Contract Bond as required by Section 153.54 of the Ohio Revised Code in an amount equal to the sum of the bid submitted by each contractor. In lieu of posting the bond, a bidder may use a Cashier's Check, Certified C heck or Letter of Credit for ten percent of the Contractor's bid as bid security. When a check or letter of credit is used, the bidder shall be required to post a 100 percent Performance Bond and a 100 percent Labor and Material Payment Bond, upon the signing of the contract. Federal Prevailing Wage Rates and Equal Employment Opportunity requirements are applicable to this project. The Owner reserves the right to reject any and all bids, and the right to accept the lowest and best bid, the right to waiver minor irregularities on any bid, and the right to accept the bid proposal which promotes the best interest of the Owner. Failure to submit the Bi d Guaranty Bond and the required notarized affidavits with the bid shall be cause for considering the bid submission incomplete and for the rejection of the bid. Each bid must contain the full name of the party or parties submitting the bid and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. All contractors and subcontractors involved with the project will, to the extent practicable use Ohio Products, materials, services, and labor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123.2, the Governors Executive Order of 1/27/72, and Governor's Executive Order 84 - 9 shall be required.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents