Similar Projects
Patchogue River Watershed Sewer Project
Infrastructure
Bidding
$400,000 est. value
Patchogue, NY

2022 Sanitary Sewer Repairs Group 1
Infrastructure
Bidding
$200,000 est. value
Colonie, NY

Broadway Sanitary Sewer Project
Post-Bid
Kingston, NY 12401

West Side Sewer Extension - Phase 1
Infrastructure
Post-Bid
Less than $15,000,000 est. value
NY

SSES Phase 3 Sub-Basins 2 and 10 Public Sanitary Sewer Repairs
Term Contract
Results
Tuxedo Park, NY 10987

Sewer District 7 - Extension 2 - Carman Road
Results
Rotterdam, NY 12306

Sewer Manhole Rehabilitation
Infrastructure
Bidding
$400,000 est. value
Buffalo, NY

2021 Catchbasins, Manholes, and Streets and Utilities Improvements
Post-Bid
Binghamton, NY

South Main Street Sewer Main Replacement
Results
Less than $90,000 est. value
Franklinville, NY 14737

Lake Durant Campground - Sanitary Sewer Improvements
Infrastructure
Bidding
$900,000 to $1,100,000 est. value
Indian Lake, NY 12812

Sewer Pipe Lining and Repair
Post-Bid
Florida, NY 10921

Underground Utility Repair Services
Results
Lewiston, NY 14092

Pumping the Septic Tank
Term Contract
Bidding
Pawling, NY

Iron Castings 2021-2022
Post-Bid
NY

Repair of Underground Utilities
Term Contract
Results
New City, NY 10956

Reported 05/19/2022 12:00 AM
Project Title

Condensate Repair Manhole 3

Physical Address View project details and contacts
City, State (County) Delhi, NY 13753   (Delaware County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Service-Disabled Veteran-Owned Business Contracting Goal: 6% 1) Excavate Site, remove paver(s), stage materials at a location the College will provide a different location on site. a. Note failed utility is at a depth of 7'-0" plus, from finish grade - Shoring required. b. Campus to provide relocation of paver(s) once staged on pallet(s) c. Excavation equipment must be rubber pad or tires to avoid damage to surrounding paver(s)/ area. d. Campus will direct location to stage spoils. 2) Remove 4" condensate piping system from southern flange located inside manhole #3, to pipe system that is in good condition, exterior (South) of the manhole #3. 3) Prep remaining pipe system and weld condensate carrier pipe in place aliening interior flange. 4) Proceed with manufactures recommended repairs for piping system (Perma-Pipe System). Provide needed materials to insulate and provide pipe protection. a. If within 9' of flange. campus will supply piping system b. Materials needed but not limited to are piping system (if greater than 9' is required), link seal kit for manhole #3, piping system joint kit suggest you place a unit price for pipe, but not part of base bid. 5) Install link seal at manhole wall & joint kit at pipe connection 6) Provide flange (150# / 8 bolt for 4" pipe), gasket, bolts in manhole and make pressure tight connection. 7) Provide backfill in 6" lifts and compacted backfill to 95% compaction. Return subgrade to within 4" of finish paver surface. Work with college to establish final subgrade. a. Campus to reinstall paver(s) b. Campus to seed lawn area & landscape

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents