Similar Projects
Last Updated | 03/22/2022 11:17 AM |
Project Title | (ICE-HSI) Backfill Project |
Physical Address | View project details and contacts |
City, State (County) | New York, NY (New York County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids. |
Project Status | Pre-Solicitation |
Bids Due | View project details and contacts |
Estimated Value | $55,000,000 to $65,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | qualified General Contractor (GC) who can provide full construction services for the Department of Homeland Security, Immigration and Customs Enforcement-Homeland Security Investigations (ICE-HSI) Backfill Project at the Federal Office Building (Building) - GSA intends to renovate space within the existing building for the ICE-HSI. The project site is at an existing Federal building situated on a full urban city block. The building is a 12-story Art Deco office building with over 1 million square feet, each of the floor plates being approximately 80,000 square feet. The building is listed on the National Register of Historic Places. This designation is for the exterior envelope of the building. ICE-HSI is currently housed in a leased location. The proposed project will build out approximately 147,000 usable square feet of space on multiple floors in the building. Restacking of the building is necessary to allow for a separate entrance for secure vehicle access for ICE-HSI occupancy in contiguous space, along with separate secure internal vertical transportation.The requirement of the project is to have ICE-HSI relocate to 201 Varick Street prior to lease expiration in December 2023. - The Architect-Engineer, Construction Manager as Advisor and GC will work together to ensure that this requirement is met. - The project is currently in the design phase. The project scope includes, but is not limited to; all work to construct the ICE-HSI tenant space, and building common areas including corridors on floors to be occupied by ICE-HSI. The GC shall provide any and all construction services, labor and materials necessary to provide a complete project as described in the Construction Documents. The GC is responsible for a full build out utilizing all disciplines that may be required including, but not limited to, all new mechanical systems, electrical, plumbing, fire safety, and all specialty equipment including a Sensitive Compartmented Information Facility , roof-top generators, escalators and elevators. |
||||||||||||||||||||||||||||||||||||
Details | 1 Military Facility, Approximately 147,000 SF Build-Out, Building.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |