Similar Projects
Alameda County Fire Department Training Center - #20142 - Alameda County
New Construction, Infrastructure
Conception
$30,056,880 CJ est. value
Dublin, CA 94568

Castlewood Drive Bridge Replacement - Alameda County
Demolition, New Construction, Infrastructure
Conception
$5,955,000 CJ est. value
Oakland, CA 94605

Village Green Apartments
New Construction, Infrastructure - 12,000 SF
Design
$42,000,000 CJ est. value
San Lorenzo, CA 94580

Grayson Street Life Sciences Facility Development
New Construction, Infrastructure - 187,000 SF
Design
$63,000,000 CJ est. value
Berkeley, CA 94710

Cold Plane Pavement and Overlay With RHMA-G/RHMA-O
Infrastructure
Bidding
$67,000,000 CJ est. value
Fremont, CA 94538

Cherry Street Class IV Separated Bikeways
Infrastructure
Bidding
$1,500,000 CJ est. value
Newark, CA 94560

SSM-THUP Project General Trades Contractor
New Construction, Alteration - 46,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Berkeley, CA 94703

La Vista Residential & The Primary School
New Construction, Infrastructure - 151,436 SF
Post-Bid
$75,000,000 CJ est. value
Hayward, CA 94544

Mission Boulevard Linear Park
Renovation
Results
$2,046,000 est. value
Hayward, CA

DVA Site Work and Geotechnical Mitigation for Alameda Columbarium and Outpatient Clinic and Conservation Management Office
Alteration
Results
$25,000,000 to $100,000,000 est. value
Alameda, CA

Shattuck Avenue Apartments
New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Berkeley, CA 94704

West Grand and Brush Street Apartments
New Construction, Infrastructure
Construction
$22,364,000 CJ est. value
Oakland, CA 94612

Timber Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Newark, CA 94560

Admirals Cove Infill
Demolition, New Construction, Infrastructure - 348,850 SF
Pending Verification
$72,011,310 CJ est. value
Alameda, CA 94501

Santa Fe Right of Way - PRWPK21012 - City of Berkeley
New Construction
Conception
$4,050,000 est. value
Berkeley, CA 94704

Last Updated 03/02/2023 09:31 AM
Project Title

Playground Installation at Eden Gardens and Longwood Elementary

Physical Address View project details and contacts
City, State (County) Hayward, CA 94541   (Alameda County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,215,658 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project Consists of: Contractor Shall Remove Existing Equipment, Provide and Install New Playground Equipment and Perform Miscellaneous Work as Outlined in the Drawings and Specifications. All Bids Shall Be on the Form Provided by the District. Each Bid Must Conform and Be Responsive to All Pertinent Contract Documents, Including, but Not Limited to, the Instructions to Bidders. To Bid on This Project, the Bidder is Required to Possess One or More of the Following State of California Contractor Licenses: a or B the Bidder's License(S) Must Be Active and in Good Standing at the Time of the Bid Opening and Must Remain So Throughout the Term of the Contract. As Security for Its Bid, Each Bidder Shall Provide With Its Bid Form a Bid Bond Issued by an Admitted Surety Insurer on the Form Provided by the District, Cash, or a Cashier's Check or a Certified Check, Drawn to the Order of the Hayward Unified School District, in the Amount of Ten Percent (10%) of the Total Bid Price. This Bid Security Shall Be a Guarantee That the Bidder Shall, Within Seven (7) Calendar Days After the Date of the Notice of Award, Enter Into a Contract With the District for the Performance of the Services as Stipulated in the Bid. The Successful Bidder Shall Be Required to Furnish a 100% Performance Bond and a 100% Payment Bond if It is Awarded the Contract for the Project. The Successful Bidder May Substitute Securities for Any Monies Withheld by the District to Ensure Performance Under the Contract, in Accordance With the Provisions of Section 22300 of the Public Contract Code. The Successful Bidder and Its Subcontractors Shall Pay All Workers on the Project Not Less Than the General Prevailing Rate of Per Diem Wages and the General Prevailing Rate for Holiday and Overtime Work as Determined by the Director of the Department of Industrial Relations, State of California, for the Type of Work Performed and the Locality in Which the Work is to Be Performed Within the Boundaries of the District, Pursuant to Sections 1770 Et Seq. Of the California Labor Code. Prevailing Wage Rates Are Available From the District or on the Internet at: . Bidders and Bidders' Subcontractors Shall Comply With the Registration and Qualification Requirements Pursuant to Sections 1725.5 and 1771.1 of the California Labor Code. The District's Board Reserves the Right to Reject Any and All Bids and/or Waive Any Irregularity in Any Bid Received. If the District Awards the Contract, the Security of Unsuccessful Bidder(S) Shall Be Returned Within Sixty (60) Days From the Time the Award is Made. Unless Otherwise Required by Law, No Bidder May Withdraw Its Bid for Ninety (90) Days After the Date of the Bid Opening. The District Shall Award the Contract, if It Awards It at All, to the Lowest Responsive Responsible Bidder Based on the Base Bid Amount Only. All Bidders' Questions Must Be Submitted in Writing via Email to Rosegarcia@husd.k12.ca.us Ot 6707411; Oct. 21, 2022 All bidders' questions must be submitted in writing via email to rosegarcia@husd.k12.ca.us

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents