Similar Projects
Ephrata Borough Solids Processing and Handling Upgrades- General Construction
Renovation
Bidding
Ephrata, PA

Wastewater Treatment Plant Project - General/Process Mechanical
New Construction, Alteration
Bidding
$7,225,000 est. value
Reinholds, PA

UV Disinfection System
Post-Bid
$175,000 est. value
Kittanning, PA 16201

Install a Single Residence Sewage Treatment Plant
Post-Bid
PA

Wastewater Treatment Plant Upgrade General
Results
$22,500,000 est. value
Rochester, PA 15074

Wastewater Treatment Plant Upgrade - General Construction
Results
$5,840,000 est. value
Westfield, PA 16950

Sand Spring Wastewater Treatment Plant Upgrades- General/Process Mechanical
Construction
Less than $3,000,000 est. value
Schnecksville, PA 18078

LTTTJMSA Wastewater Treatment Plant (WWTP) - General Construction
Construction
$3,941,500 est. value
Tunkhannock, PA

Wastewater Treatment Plant Dewatering Centrifuge Installation
Renovation
Bidding
Albion, PA

Install Four Single Residence Sewage Treatment Plants
Post-Bid
Harborcreek, PA 16421

SCI Muncy - New Sewage Treatment Building and Restoration of Sanitary Sewer Lines
Results
Less than $4,000,000 est. value
PA

Wastewater Treatment Plant Phase II - General Construction
Construction
$6,250,000 to $7,250,000 est. value
Greencastle, PA 17225

KIWWTP Thickener No 3 Upgrades
Renovation
Bidding
$450,000 est. value
Allentown, PA 18102

General Construction Site I Clarifier Equipment Removal and Replacement Project
Post-Bid
North East, PA

Clark Well Access Box Culvert
Results
Wellsboro, PA 16901

Reported 01/06/2022 12:00 AM
Project Title

Primary and Secondary Treatment Facilities Rehabilitation - General Construction

Physical Address View project details and contacts
City, State (County) Erie, PA 16507   (Erie County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $4,046,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work generally includes rehabilitation of the concrete structures used for primary and secondary treatment at the WWTP, replacement of handrail, replacement of steel bar grating, and modifications to existing raceways and wiring for existing electrical and instrumentation equipment. The foregoing description shall not be construed as a complete description of all work required.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents