Similar Projects
Curb and Ramp Installations on SR-4, SR-7, SR-23, SR-25, SR-53, SR-75, and SR-144 at Various Locations
Infrastructure
Bidding
$1,071,262 CJ est. value
Rosa, AL 35121

Curb and Ramp Installations on SR-4, SR-7, SR-23, SR-25, SR-53, SR-75, and SR-144 at Various Locations
Infrastructure
Bidding
$1,071,262 CJ est. value
Rosa, AL 35121

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Approach Clearing and Grading - Runway 24 at Robbins Field Airport
Infrastructure
Post-Bid
$3,000,000 est. value
Altoona, AL 35952

Roadway Leveling, Patching and Overlay
Infrastructure
Results
Blountsville, AL 35031

Stricklin Drive and Head Drive Road Widening
Infrastructure
Results
$200,000 est. value
Cleveland, AL 35049

Champion Road Booster Pump Station Replacement
Infrastructure, Renovation
Bidding
$510,000 CJ est. value
Oneonta, AL 35121

Oneonta Recreation Park
Infrastructure
Post-Bid
$200,000 CJ est. value
Oneonta, AL 35121

Constructing the Widening, Resurfacing, and Traffic Stripe on Cr-8 (Skyline Drive) from the Junction Of Rickwood Caverns Road to a Point Easterly at Mp 4.355 West of Smoke Rise
Infrastructure
Results
$234,292 to $286,357 est. value
AL

US Highway 231 Water Line Replacement
Infrastructure
Post-Bid
$400,000 CJ est. value
Blountsville, AL 35031

Constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-79 from the Junction of SR-53 (US-231) Northeast of Cleveland to the Intersection of SR-74 (US-278) in Brooksville (Site 1) and on SR-53 (US-231) from the Junction of SR-79
Infrastructure
Results
$2,848,518 to $3,481,522 est. value
AL

Excavation and Grading Work - for a New Multi-Purpose Facility
Infrastructure
Post-Bid
$960,000 est. value
Cleveland, AL

Oneonta Utilities Board Office
Addition, Demolition, Renovation, Infrastructure - 7,560 SF
Post-Bid
$700,000 CJ est. value
Oneonta, AL 35121

2021 ALDOT Bridge Replacement Utility Relocation
Demolition, New Construction, Infrastructure
Post-Bid
$530,000 CJ est. value
Oneonta, AL 35121

Last Updated 10/28/2022 09:04 AM
Project Title

Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-79(Site 1) and SR-160(Site 2)

Physical Address View project details and contacts
City, State (County) Cleveland, AL 35049   (Blount County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $4,095,776 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Tuscaloosa Constructing the Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-79 from the junction of Pine Bluff Road in Locust Fork to the junction of SR-53 (US-231) in Cleveland (Site 1) and on SR-160 from the junction of Odice Branham Road in Nectar to the junction of SR-53 (US-231) in Cleveland (Site 2). Length 11.903 mi. The Bracket Estimate on this project is from $4,153,673 to $5,076,711 . Contract Time: 90 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 015 - Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-79(Site 1) and SR-160(Site 2) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents