Similar Projects
Enola Road Pavement Preservation
Infrastructure
Conception
$6,565,748 CJ est. value
Carlisle, PA 17015

Enola Road Pavement Preservation
Infrastructure
Conception
$6,565,748 CJ est. value
Carlisle, PA 17015

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

RFP Engineering - Doublin Gap Motocross Access Drive Site Design Plan
Infrastructure
Bidding
$150,000 CJ est. value
Shippensburg, PA 17257

RFP Engineering - Doublin Gap Motocross Access Drive Site Design Plan
Infrastructure
Bidding
$150,000 CJ est. value
Shippensburg, PA 17257

Cut Out Sidewalk and Install ADA Concrete Ramp
Infrastructure
Post-Bid
Carlisle, PA

RFQ Contractor - AHEC Track Lighting Install
Infrastructure
Post-Bid
$200,000 CJ est. value
Carlisle Brks, PA 17013

Carlisle Pike Resurf
Results
$1,000,000 to $2,499,999 est. value
PA

Furnish all Equipment, Materials and Labor for Double Application of Micro-Surfacing on Various Township Roads
Results
New Cumberland, PA 17070

York Road-Trindle Road Widening
Construction
$1,500,000 to $2,500,000 est. value
Boiling Springs, PA 17007

Riverton Woods / Lemoyne Borough
New Construction, Infrastructure
Construction
$11,000,000 CJ est. value
Lemoyne, PA 17043

Smith Farm Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$60,000,000 CJ est. value
Carlisle Brks, PA 17013

Hempt Farms Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Mechanicsburg, PA 17050

Enola Road over Bloser Creek
Demolition, New Construction, Infrastructure
Conception
$550,000 CJ est. value
Carlisle, PA 17015

Last Updated 02/24/2023 08:11 AM
Project Title

Boiling Springs Ped

Physical Address View project details and contacts
City, State (County) South Middleton Township, PA 17015   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $432,330 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Front Street (SR 2003) from High Street to 1st Street (SR 174) South Middleton Township Cumberland County. Primary Improvement Type: Pedestrian Facilities As of February 24, 2023, the project is Future development stage. Anticipated letting date is March 30, 2023. PennDOT - Boiling Springs Ped *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents