Similar Projects
Pine Ridge Elementary School New Administration Building
New Construction
Conception
$3,300,000 est. value
Magalia, CA 95954

Cedarwood Elementary School Classroom Wing Addition
Addition
Conception
$13,900,000 est. value
Clovis, CA 93611

Delevan Drive Elementary School
Addition
Design
Los Angeles, CA 90065

Primrose School - Orchards Shopping Center / Walnut Creek
New Construction, Infrastructure - 12,838 SF
Design
$2,800,000 CJ est. value
Walnut Creek, CA 94598

Telfair Elementary School ADA Barrier Removal
Infrastructure
Bidding
$1,910,000 CJ est. value
Los Angeles, CA 91331

Ericson Elementary School New Multi-Purpose Building and Interim Housing
Demolition, New Construction, Infrastructure
Bidding
$9,409,153 CJ est. value
Fresno, CA 93703

La Vista Residential & The Primary School
New Construction, Infrastructure - 151,436 SF
Sub-Bidding
$75,000,000 CJ est. value
Hayward, CA 94544

Network Switching Upgrade
Renovation
Sub-Bidding
$200,000 CJ est. value
Torrance, CA 90503

Preconstruction and Lease-Leaseback Construction Services
Renovation
Post-Bid
$2,640,000 est. value
Gustine, CA 95322

Park ES Early Education Center Renovations
Renovation - 3,086 SF
Post-Bid
$220,000 est. value
Alhambra, CA 91899

Architectural Services for HVAC Systems And Development Of New Permanent Modular Building(s)
Renovation, Alteration
Results
Buttonwillow, CA 93206

Orchard Dale Elementary School Modernization Project- General Construction
New Construction - 68,394 SF
Results
Whittier, CA 90603

Phase 1 Esser Shade Structures - Group 2 Various Sites
Infrastructure
Construction
$695,000 CJ est. value
Lakewood, CA 90712

Vermont Manchester
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Los Angeles, CA 90044

La Vista Residential & The Primary School
New Construction, Infrastructure - 40,000 SF
Pending Verification
$75,000,000 CJ est. value
Hayward, CA 94541

Last Updated 12/22/2022 09:15 AM
Project Title

Modernization at Armona Elementary School Armona Union Elementary School District 2

Physical Address View project details and contacts
City, State (County) Armona, CA 93202   (Kings County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,794,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Modernization at Armona Elementary School Armona Union Elementary School District 2 PROJECT TRACKING NUMBER 63875-14 Completed DIR Information: Within 24 hours of the opening of the bids, the apparent low bidder shall submit completed DIR information on the Subcontractor List to the Armona Union Elementary School District at its offices located at 11115 C Street, Armona, CA 93202. DVBE Information: Within 24 hours of the opening of the bids, the apparent low bidder shall submit the Prime Bidder Good Faith Effort Worksheet and Prime Bidder Certification of Disabled Veteran Business Enterprise Participation forms to the Armona Union Elementary School District at its offices located at Armona Union Elementary School District offices located at 11115 C Street, Armona, CA 93202. All bidders will be deemed to have notice of all conditions and information which bidders could have obtained by attending the pre-bid conference, including but not limited to any conditions in, at, and about the site, the building or buildings, if any, and any work that may have been done thereon. Bids will not be accepted from bidders who did not attend the pre-bid conference. Bids shall be on a lump sum basis. The Work shall be completed by July 31, 2023, commencing with the date established in the written notice from Owner to proceed Contract Documents have been prepared by Mangini Associates Inc. Documents may be examined and obtained at the Architect's office, 4320 West Mineral King Avenue, Visalia, CA 93291, (559) 627-0530, Monday through Thursday between 8 am and 5 pm and Friday between 8 am and 12 pm The architects contact for questions or RFI's is Dustin Hutsell at dustin@mangini.us. No partial sets or individual sheets will be issued or sold. .6 Only plan holders and the listed exchanges will be notified of Addenda. 9. SUBSTITUTIONS: Pursuant to California Public Contract Code Section 3400, contractors and material suppliers shall submit requests to the Architect, not less than 10 days prior to bid (if material is to be included on final addendum), all data substantiating a request for substitution of materials. In order to be considered, substitutions of materials or equipment must comply with the requirements of specification Section 01 2500, including providing comparative data and samples. Pursuant to Public Contract Code, Section 3400, Subdivision (b)2, no substitutions will be permitted for the following items which the Owner has determined are required in order to match products in use on improvements throughout the District: .1 Door Locks and Latches specified in Section 08 7100: Schlage with Classic "F" keyway .2 Intrusion Alarm System specified on the Drawings. 10. BID SECURITY: Submit bid security with proposal, made payable to Owner, in amount of 10% of the Bid, in the form of certified check, bid bond, cashier's check or cash. Bid security will be retained until Agreement is signed and required bonds furnished. If any bidder refuses to sign the Agreement Form within 7 days after Award, the Owner will retain his bid security as liquidated damages The Owner will not consider or accept any bids from contractors or subcontractors who are not licensed to do business in the State of California, in accordance with the California Public Contract Code of the State of California, providing for the licensing of contractors. In accordance with Section 3300 of said Code, the Contractor shall have a Class B license and shall maintain that license in good standing through Project completion and all applicable warranty periods AWARD: The Owner reserves the right to reject any and all bids and/or waive any informality in any bid received and/or determine in its discretion the responsibility of any bidder, and which bid is most advantageous to the Owner. Unless otherwise required by law, no bidder may withdraw his bid for a period of 60 days after the date set for the opening thereof, or any authorized postponement thereof. The Owner reserves the right to take more than 60 days to make a decision regarding the rejection of bids or the award of the Contract. 13. PREVAILING WAGES: The Project is a public work and under California Labor Code Section 1770 et seq., the Director of the California Department of Industrial Relations ("DIR") has determined the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in the locality in which the work is to be performed, for each craft, classification or type of worker needed to execute this Contract. Copies of the rates are on file at the Owner's principal office. It shall be mandatory upon the Contractor and on any subcontractor to pay not less than the said specified rates to all workers employed in the execution of this Agreement. 14. DIR REGISTRATION: The Owner will not accept any bid or enter into any contract without proof of the bidders current registration to perform public work under Labor Code Section 1725.5. Bidders shall not accept any subbid or enter into any subcontract without proof of the subcontractor's current registration to perform public work under Labor Code Section 1725.5. 15. LABOR COMPLIANCE: Contractor and all subcontractors shall comply with Labor Code Section 1776. In accordance with Labor Code section 1771.4(a)(1), the Project is subject to compliance monitoring and enforcement by the DIR. The Contractor and each subcontractor shall furnish a certified copy of all payroll records directly to the Labor Commissioner on a monthly basis, unless directed by the Owner to furnish such records more often, and in the format prescribed by the Labor Commissioner. 16. RETENTION FUND: The successful bidder will be allowed to substitute securities or establish an escrow in lieu of retainage, pursuant to Public Contract Code Section 22300, and as described in the Agreement Between Owner and Contractor and General Conditions. 17. REQUIRED CERTIFICATIONS: Bids must be accompanied by the following forms, fully executed by each Bidder: .1 Fingerprinting Notice and Acknowledgment .2 Acknowledgment regarding Tobacco Products Prohibited From School Property .3 Acknowledgment regarding Alcohol and Controlled Substances Prohibited From School Property .4 Acknowledgment regarding No Contracting with Sanctioned Entities 18. DSA OVERSIGHT PROCESS: The Contractor shall comply with the applicable requirements of the Division of State Architect (DSA) Construction Oversight Process (DSA Oversight Process), including but not limited to (a) notifying the Project Inspector upon commencement and completion of each aspect of the work as required under DSA Form 156; (b) coordinating the Work with the Project Inspectors inspection duties and requirements; (c) submitting verified reports under DSA Form 6-C; and (d) coordinating with the Owner, Owners Architect, any Construction Manager, any laboratories, and the Project Inspector to meet the DSA Oversight Process requirements without delay or added costs to the Project. 19. DVBE REQUIREMENTS: The Owner will require the successful Bidder to achieve the minimum goal of 3% DVBE (Disabled Veteran Business Enterprises) established in the bidding documents or to provide acceptable evidence of good faith efforts to do

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents