Similar Projects
Gaoa Big Hole Recreation Site Renovations, Montana
Term Contract
Design
$500,000 to $1,000,000 est. value
Butte, MT 59707

Sanding Material 1-Location Billings Area
Term Contract
Bidding
Billings, MT

Sanding Material 2 - Locations Great Falls Area
Infrastructure
Bidding
Great Falls, MT

Deadmans' Supply Canal Rehabilitation
Alteration
Post-Bid
MT

Sanding Material 1A-Location Butte Area
Infrastructure
Post-Bid
Butte, MT

204 Grandview Dr - Reserve Dr Upgrades
Alteration
Results
Kalispell, MT

Sanding Material 2-Locations Bozeman Area
Infrastructure
Results
Bozeman, MT

Sanding Material 3-Locations Billings Area
Term Contract
Bidding
Billings, MT

Sanding Material 1B-Location Missoula Area
Infrastructure
Post-Bid
Missoula, MT 59808

Tiber Dam Shoreline Material Supply
Term Contract
Results
Chester, MT 59522

Sanding Material 2A-Locations Great Falls Area
Infrastructure
Bidding
Great Falls, MT

Sanding Material 1B-Location Butte Area
Infrastructure
Post-Bid
MT

Sanding Material 1-Location Miles City Area
Infrastructure
Bidding
Miles City, MT

Sanding Material 2-Locations Butte Area
Infrastructure
Post-Bid
Butte, MT

Sanding Material 1A-Location Lewistown Area
Infrastructure
Bidding
Lewistown, MT

Reported 06/21/2022 12:00 AM
Project Title

Sanding Material 1A-Location Bozeman Area

Physical Address View project details and contacts
City, State (County) Bozeman, MT   (Gallatin County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Montana Department of Transportation (MDT) is accepting bids for Sanding Material 1A-Location Bozeman Area.Question Submission Close Date 6/16/2022 2:00 PM MDT Questions or information relating to either specifications or requirements of this solicitation must be asked through electronically Q&A Board. Potential bidders must log into eMACS to submit a question on the Q&A Board. Work Cannot Begin Until After: July 1, 2022.Work Is Required To Be Completed On Or Before: October 21, 2022 The successful bidder may, at their own risk, perform preparatory materials work only for this contract prior to July 1, 2022. However, the Department will not accept delivery of material or make payment for any work or pay item prior to July 1, 2022. A purchase order must be issued and in place prior to the commencement of any work for the Department. Contractors are allowed to bid on one or both options. Contractor is required to provide a unit cost for all item(s) listed in the Bid Quantity sheet(s) for either option the Contractor is bidding. The low bidder will be determined, and the project awarded based on the lowest bid for either option. The Department can issue a Purchase Order Adjustment (POA) to include any or all Option Bid item(s) bid. The Maintenance Chief reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the Contract nor release the surety, and the Contractor agrees to perform the work as altered.

Details

Division 32 - Exterior Improvements, Aggregate Surfacing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents