Similar Projects
Downtown Alley Rehabilitation - Mid Way - City Of Brentwood
Alteration
Conception
$2,100,000 est. value
Brentwood, CA 94513

Solid Waste Organics Diversion - City of Brentwood
Infrastructure
Conception
$30,000,000 est. value
Brentwood, CA 94513

Primrose School - Orchards Shopping Center / Walnut Creek
New Construction, Infrastructure - 12,838 SF
Design
$2,800,000 CJ est. value
Walnut Creek, CA 94598

Mount Diablo Boulevard Multi-Use Development
New Construction, Infrastructure - 4,300 SF
Design
$10,000,000 CJ est. value
Lafayette, CA 94549

Remove PCC and AC, Place PCP and AC Resurfacing
Infrastructure
Bidding
$60,000,000 CJ est. value
Blackhawk, CA 94506

Pvmt Rehabilitation, Slab Repl, Ada Curb Ramp and Install Guardrail
Infrastructure
Bidding
$51,000,000 CJ est. value
Pittsburg, CA 94565

Remove and Install Guardrails and Construct Concrete Barriers
Infrastructure
Sub-Bidding
$12,200,000 CJ est. value
Brentwood, CA 94513

CHP Contra Costa Area Office Parking Lot Repair Services
Infrastructure
Post-Bid
Martinez, CA 94553

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Parking Lot Repairs and Seal and Stripe Services at the Concord Department of Motor Vehicles Field Office
Term Contract
Results
Concord, CA 94520

CDBG ADA Curb Ramp Installation Project
Infrastructure
Results
$175,000 est. value
Pittsburg, CA 94565

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Walden Garden Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Walnut Creek, CA 94597

River Pumping Station Rehabilitation - 7690 - City of Antioch
Renovation, Infrastructure
Conception
$1,100,000 CJ est. value
Antioch, CA 94509

AutoZone #3343 / Pittsburg
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Pittsburg, CA 94565

Last Updated 01/17/2023 08:30 AM
Project Title

Camino Sobrante Retaining Wall Replacement Project

Physical Address View project details and contacts
City, State (County) Orinda, CA 94563   (Contra Costa County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $700,378 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For: Camino Sobrante Retaining Wall Replacement Project. General work description: The project proposes to remove the existing rock retaining wall along Camino Sobrante. Work includes installing a solider pile wall with timber facing, install chain link fence, and install MGS along the shoulder of Camino Sobrante. Number of Working Days: 75 For more information about obtaining plans and specifications by mail, please call Blueprint Express at (510) 559-8299. Electronic plans and specifications are available for this project. Bid documents must be obtained as noted above in order to submit a bid. Bids and bid bonds shall be made on the Bid Proposal issued. Bids shall be accompanied by a certified cashier's check/s or bid bond in the amount of ten percent (10%) of the total bid amount, made payable to the order of "City of Orinda". Any bid received after the time specified in this Notice will be returned unopened. No oral, telegraphic, or facsimile bids or modifications will be accepted or considered. Bids must cover the entire project, including furnishing all labor, materials, equipment, transportation, and services. Neither partial nor contingent bids will be considered. The successful bidder shall furnish a payment bond and a performance bond. This contract is subject to state contract nondiscrimination and compliance requirements pursuant to Government Code, Section 12990. Pursuant to Public Contract Code Sections 7201 and 9203, the City of Orinda shall retain 5 percent of the contract price until final completion and acceptance of the project. Bidders are hereby notified that securities may be substituted for any monies withheld by the City of Orinda to ensure performance under the construction contract, in accordance with Public Contract Code Section 22300 and the Special Provisions of the Contract. Such securities shall be valued by the City's Director of Finance, whose decision shall be final. Also, types of securities which are not listed in Government Code Section 16430 or Public Contract Code Section 22300 must be approved as eligible for investment under Public Contract Code Section 22300 by the City's Director of Finance before the bid opening. Unless such securities are prequalified before bid opening, they shall not be accepted by the City as security. For the bidder's convenience, the liquidated damages table from Section 8-1.10 of the Standard Specifications has been provided below. All bidder questions/requests for interpretation shall be made in writing and delivered to the engineer listed below before 12:00 p.m. the Tuesday prior to the scheduled bid opening. For questions regarding the project contact Sivakumar Natarajan, Public Works and Engineering Services Department, at (925) 253-4254 or SNatarajan@cityoforinda.org. The City reserves the right to reject any and all bids or any portion of any bid and/or waive any irregularity in any bid received. Bidder may not withdraw their bids after the bid opening. All bids will expire on the 36th day after bid opening unless the City extends the award period beyond the 36th day after the bid opening.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents