Similar Projects
Fabrication and Delivery of Precast Boxes, Wingwalls and Headwalls
Post-Bid
Columbus, OH 43215

Storm Water Pollution Plan Griggs Boathouse
Term Contract
Post-Bid
Columbus, OH 43205

Maxwell Mine Entries
Results
Less than $54,325 est. value
Columbus, OH 43229

Laney Field Highwall
Results
Less than $284,392 est. value
Minerva Park, OH 43229

Precast Concrete Headwalls
Post-Bid

SR315 at North Broadway-Healthy Community Way Stream Mitigat
Results
Columbus, OH

Jacking and Boring Services
Post-Bid

Box Culverts
Results

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Post-Bid

Concrete Pipes
Results

Rush Run Stream Bank Stabilization
Post-Bid
$76,000 est. value
Worthington, OH

Kahler Tile Replacement Drainage Improvement Plan
Results
Less than $634,263 est. value
Columbus, OH 43215

Holton Park and Eureka Avenue Green Infrastructure Improvements
Results
Columbus, OH

Mound Street Floodwall and W. Col. Protection 611708-100000
Results
Columbus, OH

Drain Systems Cleaning and Repair
Results
Columbus, OH

Reported 12/12/2020 12:00 AM
Project Title

Northwest Stormwater Study 611721-100000

Physical Address View project details and contacts
City, State (County) Columbus, OH   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Northwest Stormwater Study to analyze stormwater drainage patterns in an area of Northwest Columbus (approximately Bethel to Ackerman, west of the Olentangy River and bounded on the west by the City of Upper Arlington) to identify flooding concerns, and develop alternatives and costs. The scope includes developing a stormwater hydraulic model, developing potential improvements with replacement of existing infrastructure or the installation of new facilities in accordance with the Stormwater Drainage Manual.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents