Similar Projects
RFQ - Wastewater System Asset Inventory and Assessment
Term Contract
Bidding
Carolina Beach, NC 28428

RFQ Design - Cape Fear Museum Renovations
Renovation
Bidding
Wilmington, NC 28401

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

Engineering, Planning and Development
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

RFQ Design - Professional Engineering Consulting Services CFPUA Sustainability Enhancements Project
Renovation
Bidding
$749,000 CJ est. value
Wilmington, NC 28403

C--Multiple Award Task Order Contract (MATOC)
New Construction, Term Contract
Post-Bid

Coastal Engineering Facility
Results
Less than $4,900,000 est. value
Wilmington, NC

Microgrid Architectural And General Engineering Services
New Construction, Term Contract
Post-Bid
$10,000,000 est. value

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Professional Engineering, Architecture and Technical Services
New Construction, Term Contract
Post-Bid

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

Architectural and Engineering Design Services
Alteration
Post-Bid
NC

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Last Updated 10/21/2022 07:40 AM
Project Title

RFQ Design - Richardson Water Treatment Plant- Concentrate Treatment

Physical Address View project details and contacts
City, State (County) Wilmington, NC 28411   (New Hanover County)
Category(s) Professional Services
Sub-Category(s) Architectural
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 3, 2022, this project is in the conceptual phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to July 2023. *The closed solicitation has been included below for reference: Cape Fear Public Utility Authority (CFPUA) requests Statements of Qualifications (SOQ) from consulting engineering firms associated with program management experience and a successful track record with treatment of per- and polyfluorinated substances (PFAS) in groundwater, hydrogeology, familiarity with water distribution main design and NPDES requirements. The Richardson Water Treatment Plant (RWTP) is in Northern New Hanover County and treats groundwater obtained from the Castle Hayne and PeeDee Aquifers to produce about 7 million gallons of drinking water per day (mgd). The plant treats raw water using reverse osmosis (RO) skids. RO concentrate is discharged to the Intracoastal Waterway through a National Pollutant Discharge Elimination System (NPDES) Permit. The purpose of this Request for Qualifications is to obtain submittals from qualified engineering firms to evaluate treatment solutions for removal of PFAS in the RO concentrate waste stream. The project will consist of piloting treatment solutions for PFAS removal, developing a preliminary engineering report, engineering design, permitting, and assistance with obtaining construction bids and awarding a contract to construct the project. Construction phase engineering services may be negotiated at a later date. Effective treatment solutions should include, but not limited to, granular activated carbon (GAC), ion exchange resins and/or high-pressure membrane systems treatment technologies. The selected firms will be notified by telephone and/or email. The CFPUA reserves the right to reject any and all Proposals. CFPUA will address questions regarding the RFQ until 2:00PM on July 19, 2022. Questions submitted after this time will not addressed. Any questions concerning this advertisement should be directed to Julia Faircloth, Procurement Manager, Cape Fear Public Utility Authority, at bids@cfpua.org by July 19, 2022, at 2:00pm. Notice to proceed September 1, 2022 The method of Contractor Selection has not been Determined at this time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. Awarded to : HDR-Wilmington, NC Start Date 09/01/2022

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents