Similar Projects
Springfield Twp Multimodal Trail Ph 2
Infrastructure
Conception
$10,000 CJ est. value
Mercer, PA 16137

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

State Street Pedestrian Improvements
Infrastructure
Design
$1,006,200 CJ est. value
Hermitage, PA 16148

State Street Pedestrian Improvements
Infrastructure
Design
$1,006,200 CJ est. value
Hermitage, PA 16148

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

300 Tons Superpave Wearing Course
Infrastructure
Post-Bid
Grove City, PA

Multimodal Phase III Contract
Infrastructure
Results
$1,300,000 to $1,500,000 est. value
Sharon, PA

Multimodal Phase III Contract
Infrastructure
Results
$1,300,000 to $1,500,000 est. value
Sharon, PA

Waterline Replacement Projects - Group 2
Infrastructure
Construction
$734,995 CJ est. value
Greenville, PA 16125

Waterline Replacement Projects - Group 2
Infrastructure
Construction
$734,995 CJ est. value
Greenville, PA 16125

McAlister's Deli / Hermitage
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Hermitage, PA 16148

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Sharon Gateway Project
Infrastructure
Results
$500,000 to $999,999 est. value
PA

Last Updated 04/28/2023 11:07 AM
Project Title

Parking Lot Resurfacing at Primary Health Sites

Physical Address View project details and contacts
City, State (County) Greenville, PA 16125   (Mercer County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

The Primary Health sites included are as follows: Greenville Community Health Center, 348 Main Street, Greenville, PA 16125 Autumn Street Health Center, 99 Autumn Street, Aliquippa, PA 15001 New Castle Primary Care, 1112 South Mill Street, New Castle, PA 16101 It is the intent of the Owner to enter into a single contract for the work. Bids shall include a Bid Security Bond or Certified Check, payable to the Primary Health Network, in an amount of five percent (5%) of the bid, in accordance with Instructions to Bidders, as included in the Contract Documents. Furnish and install the following amounts of square feet of exterior concrete sidewalks, beyond the extent shown on drawings, to be located by the Architect in the field. Comply with typical 5 1/2" thick exterior, reinforced concrete walk on 4" gravel base details as shown on drawings (Detail B3/SP2.1) and materials as specified in Section 033000. Include removal and disposal of existing sidewalk and/or lawn and preparation of subgrade.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents