Similar Projects
Site work for a golf course in Laurel, Maryland.
Infrastructure
Conception
$831,000 CJ est. value
Longview, WA 98632

46th Avenue Construction - City of Longview
Demolition, New Construction, Infrastructure
Conception
$3,650,000 CJ est. value
Longview, WA 98632

SR 504/N Fork Toutle River Kid Valley Bridge - Repair Girders
Infrastructure, Renovation
Design
$2,361,000 CJ est. value
Toutle, WA 98649

I-5/SB Toutle River Bridge - Painting
Renovation, Infrastructure
Design
$4,085,000 CJ est. value
Castle Rock, WA 98611

RFQ Contractor - Mount St. Helens SRS Crest Raise
Infrastructure
Bidding
$10,000,000 CJ est. value
Toutle, WA 98649

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Lower Columbia College - Water Line Replacement - Vancouver
Infrastructure
Results
$72,000 CJ est. value
Longview, WA 98632

Rose Way Industrial Park Buildings 1 and 2
New Construction, Infrastructure
Results
$5,221,000 CJ est. value
Woodland, WA 98674

Waterfront Condominiums
New Construction, Infrastructure
Pending Verification
$15,500,000 CJ est. value
Woodland, WA 98674

Madrona Avenue Water Main Replacements - City of Longview
Infrastructure
Conception
$550,000 CJ est. value
Longview, WA 98632

Beacon Hill Reservoir
Infrastructure
Design
$300,000 CJ est. value
Kelso, WA 98626

Kelso High School Practice Field Improvements
Infrastructure
Post-Bid
$320,000 CJ est. value
Kelso, WA 98626

Warehouse 11 Paving
Infrastructure
Results
$459,033 CJ est. value
Longview, WA 98632

North Kelso-Pacific-Redpath to Dirk - W-10 - City of Kelso
Infrastructure
Conception
$1,250,000 CJ est. value
Kelso, WA 98626

Last Updated 04/27/2023 05:18 PM
Project Title

SWRA: Fuel System Equipment Procurement

Physical Address View project details and contacts
City, State (County) Kelso, WA 98626   (Cowlitz County)
Category(s) Commercial, Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $591,001 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Parrott Way Project Category Code: Airport Fueling Systems Description: The proposed work shall be for the furnishing of all labor, subject to State prevailing wage, equipment, materials and supervision for the construction in Kelso of the following description of work: 1. Deliver 1 12,000 gallon UL-2085 tank and dispensers to site for avgas storage. 2. Deliver 1 12,000 gallon UL-2085 tank and dispensers to site for Jet-A storage. 3. Deliver 1 Fuel management system. All proposals must be submitted on the regular form furnished with the specifications in a sealed envelope clearly marked with the name of the bidder, the name of the project, and the date and time of the bid opening. Each bid must be accompanied by a bid proposal deposit in the form of a certified check or bidder's bond made payable to the City of Kelso in an amount not less than five percent (5%) of the total bid and shall not be conditioned in any way to modify the minimum five percent (5%) required. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Kelso. The City of Kelso reserves the right to reject any or all bids, waive informalities or irregularities and to accept any bid for the project, which appears to serve the best interest of the City.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents