Similar Projects
Replace MEP Systems at Lecture Center at SUNY New Paltz
Post-Bid
New Paltz, NY 12561

OSC Cooling Tower Replacement
Term Contract
Post-Bid
Lake Placid, NY 12946

Foley AC-1 Replacement Project
Results
Albany, NY 12207

HVAC Equipment_Service and Preventative Maintenance Contract
Results
Buffalo, NY 14207

New Climate Control System-West Haverstraw Village Community Center Gymnasium
Post-Bid
West Haverstraw, NY 10993

J--HVAC Cleaning of Wards 5C and 9A (VA-19-00018526)
Results
Buffalo, NY NY

HVAC Project
Post-Bid
Mechanicville, NY 12118

Campus Center AC-2 Upgrade
Results
Albany, NY

FAB Heating Upgrade
Post-Bid
New Paltz, NY 12561

J--Batavia Boiler Plant Work (Va-19-00027248)
Results
Batavia, NY 14020

Heating, Ventilating and Air Conditioning (HVAC) Contractors
Term Contract
Post-Bid
Fishkill, NY 461052

Rotary Forge & Cooling Towers
Results
Watervliet, NY 12189

NextGen HVAC Technology Challenge
Term Contract
Post-Bid
Albany, NY 12203

Duct Work Cleaning at Building 25
Results
Watervliet, NY 12189

Maintenance and Repair of HVAC
Post-Bid
NY

Last Updated 07/10/2020 10:06 AM
Project Title

Main Boiler Plant Combustion Ventilation and Reverse Osmosis System

Physical Address View project details and contacts
City, State (County) Syracuse, NY 13210   (Onondaga County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: To include all necessary labor, material and equipment for a single prime contract with work consisting of 1) modification of and additions to the combustion air makeup and ventilation system serving the boilers and the boiler room, and 2) the addition of a reverse osmosis (RO) makeup water system to serve the boilers. All necessary work, including but not limited to mechanical, electrical, plumbing, controls, and general construction is to be included in this bid. State University of New York also has a goal for the Work Force participation: EEO 10% WBE and EEO 10% MBE of total work force on the project.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents