Similar Projects
Mid America Commerce Center
New Construction, Infrastructure
Conception
$80,000,000 CJ est. value
Belleville, IL 62269

Mid America Commerce Center
New Construction, Infrastructure
Conception
$80,000,000 CJ est. value
Belleville, IL 62269

Central Park - Lot 1
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
O Fallon, IL 62269

Central Park - Lot 1
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
O Fallon, IL 62269

Construction of the South Trunk Main Replacement - Phase 1
Infrastructure
Bidding
$2,000,000 CJ est. value
O Fallon, IL 62269

Construction of the South Trunk Main Replacement - Phase 1
Infrastructure
Bidding
$2,000,000 CJ est. value
O Fallon, IL 62269

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Upgrade Walkway Walls/Replace Parking Lot
Infrastructure
Results
Less than $400,000 est. value
East Saint Louis, IL 62201

2021/2022 MFT General Maintenance Program - Sidewalk Replacement
Infrastructure
Results
$75,000 to $90,000 est. value
Mascoutah, IL

Freddy's Frozen Custard & Steakburgers - Belleville Crossing / Belleville
New Construction, Infrastructure - 3,238 SF
Construction
$850,000 CJ est. value
Belleville, IL 62220

Freddy's Frozen Custard & Steakburgers - Belleville Crossing / Belleville
New Construction, Infrastructure - 3,238 SF
Construction
$850,000 CJ est. value
Belleville, IL 62220

Brandywine Garden Villas
New Construction, Infrastructure - 62,622 SF
Pending Verification
$75,000,000 CJ est. value
O Fallon, IL 62269

Brandywine Garden Villas
New Construction, Infrastructure - 62,622 SF
Pending Verification
$75,000,000 CJ est. value
O Fallon, IL 62269

Hampton Manor of St. Clair County
New Construction, Infrastructure - 66,481 SF
Design
$18,000,000 CJ est. value
O Fallon, IL 62269

Last Updated 01/06/2023 04:02 PM
Project Title

West Presidential Streets Improvements - Phase II and III

Physical Address View project details and contacts
City, State (County) O Fallon, IL 62269   (Saint Clair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $3,987,743 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of a concrete gutter and hot-mix asphalt pavement on a prepared base. The preparation of the base will consist of pulverizing the existing oil and chip, as well as the addition of virgin aggregate to bring the subgrade to the appropriate elevation and crown. Certain locations will have variable depth hot-mix asphalt surface removal in lieu of the prepared base. The project will also include construction of pipe culverts, storm sewers and driveway pavement, as well as grading and shaping of ditches. Sanitary sewer and water main improvements and subsequent pavement repair are also included in the proposed project. These improvements will be located on various City Streets in an area generally bounded by State Street on the south, Madison Street on the north, Lincoln Avenue on the east and Cedar Street on the west in the City of O Fallon. No less than the prevailing rate of wages, as determined in accordance with the Illinois Prevailing Wage, shall be paid to all laborers, operators, teamsters, masons, plumbers, and any workmen employed in construction on this project. All Bidders shall be prequalified with the Illinois Department of Transportation for the classification of work involved in this project. A Certificate of Eligibility issued by the Department of Transportation of the State of Illinois shall be presented upon request prior to bidding or award of the contract as determined by the City. All work shall be performed in accordance with the Standard Specifications for Road and Bridge Construction issued by the Illinois Department of Transportation, as well as the Standard Specifications for Water and Sewer Construction in Illinois, edition in effect at the time of the bid. Each Bidder must deposit with his bid, security in the amount of not less than five percent (5%) of the Bidder's total bid price, such security being an acceptable bid bond, certified check, or cashier's check. The successful Bidder will be required to furnish a satisfactory Performance Bond in the full amount of the bid.The City of OFallon, Illinois, reserves the right to reject any or all bids and to waive any informalities or technicalities in the bidding.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents