Similar Projects
SR 38 Bypass From SR 38 / US 84 to SR 119
Infrastructure
Design
$20,000,000 CJ est. value
Walthourville, GA 31313

SR 38 Bypass From SR 38 / US 84 to SR 119
Infrastructure
Design
$20,000,000 CJ est. value
Walthourville, GA 31313

RFQ Contractor- Construction Natural Gas Generation Plant / Microgrid System - Fort Stewart
Infrastructure
Bidding
$100,000,000 CJ est. value
Fort Stewart, GA 31314

RFQ Contractor- Construction Natural Gas Generation Plant / Microgrid System - Fort Stewart
Infrastructure
Bidding
$100,000,000 CJ est. value
Fort Stewart, GA 31314

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

South Main Street Widening Rebid
Infrastructure
Post-Bid
$12,000,000 CJ est. value
Hinesville, GA 31313

Water System Improvements
Infrastructure
Results
$818,263 CJ est. value
Walthourville, GA 31313

Water System Improvements
Infrastructure
Results
$1,478,531 CJ est. value
Walthourville, GA 31313

Hunters Haven
New Construction, Infrastructure - 86,442 SF
Construction
$10,000,000 CJ est. value
Hinesville, GA 31313

Hyundai Mobis PE Systems / Richmond Hill
New Construction, Infrastructure - 500,000 SF
Pending Verification
$54,000,000 CJ est. value
Midway, GA 31320

Mavis Tire #2134 / Hinesville
New Construction, Infrastructure - 6,137 SF
Bidding
$2,380,000 CJ est. value
Hinesville, GA 31313

Tradeport East - Southeast Parcel Drainage Improvements
Infrastructure
Post-Bid
$500,000 CJ est. value
Hinesville, GA 31310

Kelly Drive Sidewalk and Roadway Improvements
Infrastructure
Results
$1,039,814 CJ est. value
Hinesville, GA 31313

JET Foods #98 / Hinesville
New Construction, Infrastructure - 6,680 SF
Post-Bid
$1,600,000 CJ est. value
Hinesville, GA 31313

RFQ - Requirement for a Firm Fixed Price, Indefinite-delivery Indefinite Quantity for Paving Civil Projects
Term Contract
Post-Bid
$25,000 CJ est. value
Fort Stewart, GA 31314

Last Updated 10/05/2023 08:20 AM
Project Title

Elm Street and Windhaven Drive Sidewalks

Physical Address View project details and contacts
City, State (County) Hinesville, GA 31313   (Liberty County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $463,953 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bidders must purchase a Bid Packet to be a registered bidder. Only bids from registered bidders will be opened. The work to be done consists of the construction of 1,600 square yards of concrete sidewalk, miscellaneous piping, catch basins, curb and gutter installation and the installation of a speed hump. Bids for the complete work in one or more general contracts shall be made on the bid form provided and shall contain prices in words and figures for the work bid. All bids shall he accompanied by a Bid Bond drawn in favor of the Liberty County Board of Commissioners, in the amount of at least five percent (5%) of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the Liberty County Board of Commissioners. Each bond shall be equal to one hundred percent (100%) of the contract amount. The Bid Bond shall be forfeited to the Liberty County Board of Commissioner as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within ten (10) days after being notified that he has been awarded the contract. The M/WBE goal for this project is 10% MBE and 3% WBE, for a total M/WBE participation of 13%. All M/WBE documents must be submitted in a separate sealed envelope, otherwise bid may be rejected. The Owner reserves the right to reject any or all bids and to waive informalities.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents