Similar Projects
FPL Avenir Substation
New Construction - 540 SF
Design
Less than $500,000 CJ est. value
West Palm Beach, FL 33412

Repair Cable and Splices in Feeder from North Substation, Cape Canaveral Space Force Station, FL
Design
Cape Canaveral, FL

Palm Beach International Airport Switchgear NPDS Replacement
Renovation
Bidding
West Palm Beach, FL 33415

Split Oak Substation Construction Project
Post-Bid
Orlando, FL 32832

Storm Restoration Services - Utility Power Infrastructure
Renovation
Post-Bid
Keystone Heights, FL 32656

Electric and Gas Professional Engineering and Design Build Services
Term Contract
Results
Fort Pierce, FL 34950

Electrical Utilities Infrastructure (Main UF Campus)
Results
$51,304,810 est. value
Gainesville, FL

T-Mobile Jacksonville Mso Switch Cooling
Construction
$3,066,225 est. value
Jacksonville, FL 32256

Emergency Power Restoration
Renovation
Post-Bid
Live Oak, FL 32060

Marydia to Hansel and BVL Transmission Line Construction
New Construction
Results
Kissimmee, FL 34741

Electric Pole Top Repairs Via Helicopter
Post-Bid
Tavernier, FL

Cane Island - Intercession City Transmission Line Construction
New Construction
Results
Less than $2,400,000 est. value
Davenport, FL 33837

Specifications To Remove And Replace Diesel Generator
Renovation
Post-Bid
Marathon, FL

Nassau Substation and Otis Road Substation Civil and Electrical 2020
Results
Jacksonville, Yulee, FL

Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 4.
Post-Bid
$1,000,000 to $5,000,000 est. value
Orlando, FL

Last Updated 11/04/2021 01:20 PM
Project Title

Construction of Lakeland Electric Substation Screening Wall

Physical Address View project details and contacts
City, State (County) Lakeland, FL 33801   (Polk County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Electric Substation, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents