Similar Projects
Spring-Fishburne Drainage Basin Improvements Phase 5 - Pump Station - City of Charleston
New Construction, Infrastructure
Conception
$37,000,000 CJ est. value
Charleston, SC 29401

Pump Station 104 Rehabilitation - Dorchester County
Renovation
Conception
$500,000 CJ est. value
Summerville, SC 29483

Huger Street Pump Station and Community Area
New Construction, Infrastructure
Design
$9,500,000 CJ est. value
Charleston, SC 29403

RFQ contractor - Installation of water and wastewater infrastructure
Infrastructure
Bidding
$2,000,000 CJ est. value
Mount Pleasant, SC 29464

Quarry Road & Old Norris Road Lift Stations Rehab
Infrastructure
Bidding
$1,000,000 CJ est. value
Liberty, SC 29657

Maryville School Lift Station Replacement
New Construction, Infrastructure
Post-Bid
Georgetown, SC 29440

Quarry Road and Old Norris Road Lift Stations Rehab
Infrastructure
Post-Bid
$580,000 CJ est. value
Liberty, SC 29657

Broadway at the Beach Pump Station Rehabilitation
Results
$400,000 est. value
Myrtle Beach, SC 29578

Berkeley Dorchester Interconnect Division II
New Construction, Infrastructure
Results
Ridgeville, SC

Construction of the Little Thicketty Creek Pump Station Upgrade
Renovation
Construction
$898,862 CJ est. value
Cowpens, SC 29330

Wild Dunes Pump Station
Infrastructure
Construction
$700,000 CJ est. value
Dewees Island, SC 29451

Pump Station Upgrades and Improvements - City of Rock Hill
Renovation
Conception
$300,000 CJ est. value
Rock Hill, SC 29730

SC Gateway Park North Wastewater Pumping Station Renovations
Infrastructure
Bidding
$1,400,000 CJ est. value
Santee, SC 29142

Pre-Engineered Duplex Pump Station
New Construction, Infrastructure
Post-Bid
$175,000 to $185,000 est. value
Pageland, SC 29728

Hunting Island Booster Pump Station Upgrade
Renovation
Results
Frogmore, SC 29920

Last Updated 04/25/2023 11:13 AM
Project Title

Rear Well Pump Replacement

Physical Address View project details and contacts
City, State (County) Florence, SC 29506   (Florence County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $41,933 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of April 25, 2023, this project has been awarded to Charles R. Underwood Inc for $41,933.13** Clemson University seeks an experienced supplier to provide and install a rear well pump at the Pee Dee Research & Education Center (REC) located at 2200 Pocket Rd. Florence, SC 29506 Offers and offer modifications must be submitted by submitting your offer electronically (b) If you are responding to more than one solicitation, you must submit separate bids for each solicitation. (c) Facsimile, hardcopy, or e-mail offers, modifications, or withdrawals, are NOT authorized Due to the value of this contract, this bid will NOT be opened publicly. Results will be communicated with bidders after evaluation is complete. . SCOPE OF WORK / SPECIFICATIONS Clemson University's Pee Dee Research and Education Center (PD REC)seeks an experienced supplier to provide and install a new Rear Well Pump to include but not limited to all labor, material, and equipment for the below services: Provide & install new Goulds 11CLC-4 pump with new Nidec 60 HP, 460V, 3PH premium efficiency motor. 85.2% eff @ 224' TDH (Total Dynamic Head) & has 321' TDH at shut off. 650 GPM. Pump bowl setting 220'. NSF61 Certified. Pump Construction: 1. Bowl Assembly: The bowls shall be flanged type constructed of close-grained cast iron conforming to ASTM A48, class 30. They shall be free from sand holes, blowholes, or other faults and must be accurately machined and fitted to close tolerances. They shall be capable of withstanding a hydrostatic pressure equal to twice the pressure at rated flow or 1.5 times shut-off head, whichever is greater. The intermediate bowls shall have enamel or epoxy-lined waterways for maximum efficiency and wear protection. All intermediate bowls shall be of identical design for interchangeability. A discharge bowl shall be used to connect bowl assembly to the discharge column. All the bowls (including the discharge bowl) shall be fitted with sleeve-type bearings of bronze alloy C89835. 2. Impellers: The impellers shall be constructed from ASTM B584 Silicon Bronze and shall be the enclosed (or semi-open) type. They shall be free from defects and must be accurately cast, machined, and filed for optimum performance and minimum vibration. Impellers shall be balanced to grade G6.3 of ISO 1940 as a minimum. They shall be securely fastened to the bowl shaft with taper locks of C1018 steel. 3. Suction: The suction bowl shall be provided with a non-soluble grease-packed bronze bearing. A bronze sand collar shall be provided to protect this bearing from abrasives in the pumping fluids. The bearing housing shall have sufficient opening at the bottom for easy removal of the bearing. 4. Shaft: The bowl shaft shall be constructed from ASTM 582 type 416 stainless steel. It shall be precision ground and polished with a surface finish better than 40 RMS. Question Cuttoff Date & Time 4/4/2023 12:00:00 PM (ET)

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents