Similar Projects
Slit Drainage System-Greens at Longshore Golf Course
Infrastructure
Bidding
$300,000 est. value
Westport, CT 06880

Ward-Heitmann House Museum Drainage Improvements
Renovation
Post-Bid
New Haven, Shelton, West Haven, CT 06516

Sanitary Sewer Contract 76B
Post-Bid
Westport, CT

Purchase of Catch Basin Grates and Manhole Covers
Results
Stamford, CT

Sanitary Sewer Contract 76; Pump Station 5 Force Main Replacement Kings Highway No
Results
$200,000 est. value
Westport, CT

Jesup Green Seawall Repairs Project
Post-Bid
Westport, CT

Repair of Shippan Avenue Seawall
Results
Less than $33,007 est. value
Stamford, CT 06902

Highway Department Yard Culvert
Post-Bid
Trumbull, CT

Old Greenwich Common Force Main Segment 3 Force Main Replacement
Results
Greenwich, CT

Proposed New Water Mains at Various Location
Infrastructure
Post-Bid
Norwalk, CT

Phase III Sewer Rehabilitation Project
Results
Less than $225,000 est. value
Fairfield, CT

CCTV Inspection and Condition Documentation of an Existing Drainage Trunkline
Infrastructure
Post-Bid
Bridgeport, CT

Road-Paving Related Drainage Repairs
Term Contract
Results
$250,000 est. value
Danbury, CT

Drainage Project - Fairchild Drive
Infrastructure
Post-Bid
Newtown, CT 06470

New Septic System for the Raymond Ambler House
Results
$72,181 est. value
Wilton, CT 06897

Last Updated 06/22/2022 03:43 PM
Project Title

Orchard Street Sanitary Sewer Replacement, Water Main Replacement and Storm Drainage Extension

Physical Address View project details and contacts
City, State (County) Danbury, CT 06810   (Fairfield County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes substantial work on Orchard Street and its West Street and George Street Intersections and all quantities are approximate. The project comprises generally all the labor, tools, materials, equipment and all work necessary to remove and replace the 6-inch water main with 8-inch main and reconnect water services, temporary water service, remove and replace sanitary sewer, manholes, and reconnect sewer services, remove and replace a section of existing storm drainage, install new storm drainage and catch basins, connect new storm drainage to existing storm drainage and restore pavement curb to curb and into intersections, driveway aprons, sidewalks and curbing; provide compaction testing of subbase; provide sedimentation and dust controls; to provide Maintenance and Protection of Traffic and construction signage; to provide temporary pedestrian ramps for sidewalks and driveway aprons for temporary water piping; provide pavement markings and all other miscellaneous work related to the project.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents