Similar Projects
Sacramento Weir Widening Construction Project
Alteration
Design
$100,000,000 to $250,000,000 est. value
West Sacramento, CA 95691

Contractor - Replace Hyde Street Pier
Infrastructure
Design
$10,000,000 est. value
San Francisco, CA

Berths 7 and 8 Fender Replacement and Structural Improvements
Infrastructure
Bidding
$1,000,000 est. value
Stockton, CA 95203

As-needed Fender Repair Services
Term Contract
Bidding
$400,000 est. value
San Diego, CA 92101

Z--Golden Gate National Recreation Area - Stabilize Alcatraz Wharf
Term Contract
Post-Bid
$10,000,000 est. value
San Francisco, CA

Suisun Marina Dock Box Replacement Project
Alteration
Post-Bid
$225,000 est. value
Suisun City, CA

Antioch Marina Boat Launch Ramp Dock Repair
Infrastructure
Results
$152,000 est. value
Antioch, CA 94509

Installation of Ada Access Ramps at Various Locations
Alteration
Results
$99,000 est. value
Loma Linda, CA

Pavement Maintenance and Repairs
Alteration
Post-Bid
$700,000 to $800,000 est. value
Solana Beach, CA

Harrison Emergency Shelter Project - Phase 2
Renovation, Alteration
Results
$375,000 to $475,000 est. value
Corona, CA

Military Ocean Terminal Concord (MOTCO) Boat Ramp
Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value
Concord, CA

Residential Street Repair Program
Infrastructure
Results
Santa Ana, CA

Floating Dock Replacement at New Melones Lake
Alteration
Post-Bid
$500,000 to $1,000,000 est. value
CA

Stearns Wharf Annual Maintenance and Repairs for 2022
Term Contract
Results
$187,688 est. value
Santa Barbara, CA 93109

NBSD Graving Dock Keel Blocks
Term Contract
Post-Bid
San Diego, CA

Reported 06/07/2022 12:00 AM
Project Title

Boat Yardwork, Maintenance and Repair

Physical Address View project details and contacts
City, State (County) San Diego, CA   (San Diego County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This is a service / maintenance or supply contract in San Diego, California. Contact the soliciting agency for additional information.The City of San Diego (City) Public Utilities Department's Environmental Monitoring and Technical Services Division (Division) conducts the Ocean Monitoring program mandated by the National Pollutant Discharge Elimination System (NPDES) Permit for the purpose of studying the effect of the City's regional treatment processes on the marine environment. The Division utilizes two monitoring vessels to conduct sampling in the ocean environment to determine its ecological health and to identify potential health concerns associated with the recreational use of San Diego's coastline. The Division requires general yardwork and preventive maintenance for the vessels, including but not limited to electrical, hydraulic, and mechanical systems, repair of engines and generators, and replacing main winch spools as needed. If vendors are unable to provide hard copy proposal packages with wet signatures due to COVID-19 related shelter in place and shutdown requirements, you may submit an electronic copy through the website in the interim by the Closing Date. Vendors will be required to provide one (2) original wet signature hard copy when requested (once Covid-19 restrictions have been lifted) by the City of San Diego. Pre-Bid Meeting No Online Q&A Yes Q&A Deadline 04/25/2022 12:00 PM (PDT)

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents