Similar Projects
Replacement Solar Array for NIST
Bidding
Gaithersburg, MD 20899

Fiber Tracer Wire Installation
Post-Bid
$1,000,000 to $2,500,000 est. value
Rockville, MD 20855

Electrical Services for the City Facilities
Post-Bid
Gaithersburg, MD 20878

Uninterruptible Power Supply Services
Results
Rockville, MD 20850

Electrical Controls
Term Contract
Results
Rockville, MD 20850

UPS System(S) Battery Replacement and Installation
Post-Bid
Gaithersburg, MD 20899

Energy Savings Performance
Results
Gaithersburg, MD 20879

Installation and Furnish of Uninterrupted Power Supply in Support of Automated Cell Culture Processing System Robot
Post-Bid
Bethesda, MD

Electrical Maintenance Gaithersburg Shop
Results
Less than $50,000 est. value
Gaithersburg, MD 20878

New Inova Onalert Emergency Led Display
Post-Bid
Rockville, MD 20850

Sound and Lighting Services for Hometown Holidays
Term Contract
Results
Rockville, MD 20850

AGM Batteries
Post-Bid
Bethesda, MD 20892

Generator Rental
Term Contract
Results
Rockville, MD 20850

Electrical Low Voltage Multiple Locations
Post-Bid
$2,000 to $1,000,000 est. value
Washington, DC - Bethesda, MD

Montgomery Village and South Village Homes Lighting and Site Improvements
Results
Rockville, MD 20850

Last Updated 09/25/2020 03:11 PM
Project Title

Arts Barn Theater Lighting System Replacement

Physical Address View project details and contacts
City, State (County) Gaithersburg, MD 20878   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor is responsible for all design, labor, and materials (including, but not limited to wiring, conduit, hangers, junction boxes, switches, etc.) required to remove the existing lighting system and replace it with a brand new system. Removal of existing system, installation and configuration of the new system and training on the new system is anticipated to begin no later than August 2020 and must be completed no later than October 1, 2020. No components of the existing system are to remain in the new system excepting the eight work lights.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents