Similar Projects
Reported | 07/02/2022 12:00 AM |
Project Title | North Star/Summit St. Water Storage Coating System Application |
Physical Address | View project details and contacts |
City, State (County) | Brighton, MI (Livingston County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storage/Water Tanks |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work consists of the following two (2) existing water storage facilities within the City of Brighton: 1. North Star Spheroid Tank - Repair, restoration and recoating a 600,000-gallon spheroid elevated water storage tank with a low-water level of 110-ft (estimated 154-ft high-water level) located at 7950 Conference Center Drive in Brighton, Michigan. 2. Summit Street Standpipe Tank - Repair, restoration, and recoating of a 770,000-gallon standpipe water storage tank with a sidewall height of 75-ft and an estimated diameter of 42-ft located at 169 Summit St. in Brighton, Michigan. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |