Similar Projects
5900 - Alger Tank - Inspect, Paint and Restore - Water Replacement - TEMP20077 - City of Grand Rapids
Infrastructure
Conception
$500,000 est. value
Grand Rapids, MI 49507

Valve and Finished Water Tank and Reservoir Improvements
Renovation, Infrastructure
Bidding
$2,000,000 est. value
Ann Arbor, MI 48103

Septage Holding Tanks Replacement Project
Infrastructure
Bidding
$300,000 est. value
Smiths Creek, MI

Water Storage Distribution System (WSDS)
Post-Bid
Detroit, MI

Removal of the Underground Storage Tank at the Jackson Street Transportation Facility
Post-Bid
Kalamazoo, MI 49001

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Underground Storage Tank Assessment and Recommendation Services
Infrastructure
Post-Bid
Detroit, MI

2021 Rehab of Brigden Tanks
Results
Battle Creek, MI

Underground Storage Tank System Removal
Infrastructure
Post-Bid
Farmington, MI 48336

Water Treatment Plant Storage Tank Improvements
Results
Big Rapids, MI

Calcium Chloride Tanks - St Ignace Garage, L'Anse Garage
Infrastructure
Post-Bid
MI

150,000 Gallon Water Tank and Scada Improvements, Contract B
Results
Vermontville, MI

Underground Storage Tank Removal and Above Ground Tank Install
Infrastructure
Post-Bid
Delton, MI

South Water Tower
Results
$232,000 est. value
Mason, MI 48854

Reported 07/02/2022 12:00 AM
Project Title

North Star/Summit St. Water Storage Coating System Application

Physical Address View project details and contacts
City, State (County) Brighton, MI   (Livingston County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of the following two (2) existing water storage facilities within the City of Brighton: 1. North Star Spheroid Tank - Repair, restoration and recoating a 600,000-gallon spheroid elevated water storage tank with a low-water level of 110-ft (estimated 154-ft high-water level) located at 7950 Conference Center Drive in Brighton, Michigan. 2. Summit Street Standpipe Tank - Repair, restoration, and recoating of a 770,000-gallon standpipe water storage tank with a sidewall height of 75-ft and an estimated diameter of 42-ft located at 169 Summit St. in Brighton, Michigan.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents