Similar Projects
Re-Roofing the Edgefield County Library
Post-Bid
Edgefield, SC

Polly Best Center Roof Replacement
Post-Bid
Less than $110,000 est. value
Barnwell, SC 29812

New Roof on Training Building
Results
Less than $27,950 est. value
Gaffney, SC 29340

Roofing Job
Results
$50,000 to $60,000 est. value
Cheraw, SC

BPH Roofing and Siding Repairs
Term Contract
Post-Bid
Columbia, SC

Admin Roof Replacement - John de la Howe School
Results
$400,000 to $500,000 est. value
McCormick, SC 29835

Brookland Lakeview Empowerment Center - CDBG Roof Replacement Project
Post-Bid
West Columbia, SC

Catawba Service Unit Roof Replacement
Results
$250,000 to $500,000 est. value
Rock Hill, SC 29730

Marion County Roofing Project for the Beeson Building
Post-Bid
Marion, SC 29571

St. James Elementary School (SJES) Roof Repair
Term Contract
Results
Myrtle Beach, SC

Roof Replacement
Post-Bid
Winnsboro, SC 29180

Z--Replace Roof-Historic LLS QTRS Building
Results
$50,000 to $100,000 est. value
Sullivan's Island, SC 29482

Roofing Supplies
Post-Bid
Columbia, SC

USC Aiken Etherredge Center Roof Repair
Results
$95,000 to $110,000 est. value
Aiken, SC

Basic Science Building Exterior Envelope Repairs - Roof
Post-Bid
$1,500,000 to $2,000,000 est. value
Charleston, SC 29425

Last Updated 06/19/2020 02:41 PM
Project Title

Roof Repairs to the Bailey Municipal Center

Physical Address View project details and contacts
City, State (County) Clinton, SC 29325   (Laurens County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $58,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A New Built Up Roof System For a +/- (6,500 Sq/Ft) Section of the m.s. Bailey Muncipal Center, Located at 211 North Broad Street, Clinton, SC, Should Consist of the Following. - Remove the Existing Roof Down to the Existing Wood Decking. - Clean Wood Decking, Then Apply One (1)PLY of 15LB. Felt Paper. - Install One (1) Layer of ¾” Perlite Roofing Insulation Using the Appropriate Fastners. - Install New Fibered Cant Strip at The Bottom of The Parapet Walls. - Apply Three (3) Plies of Type IV Fiberglass Felt Hot Mopped in Type III Steep Asphalt. - Apply New Flashing Hot Moped Using Type III Steep Asphalt to the Inside of the Parapet Wells. - Fabricate and Install New 4” Galvanized Metal Counter Flashing to the Inside of the Papapet Walls Anchored in Place to Hold The New Flashing. - Provide and Install One (1) New Cast Iron Roof Drain With Piping on The Rear of The Roof Area. - After All Detailed Work is Complete Entire Roof Shall be Moped With Typr III Steep Asphalt for The Final Coating all Materials Removed From The Roof During Repairs Must be Removed From Site at The Constractors Expense.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents