Similar Projects
Last Updated | 10/09/2023 05:33 AM |
Project Title | Engineering Building Unit 2 (EBU2) HVAC Replacement |
Physical Address | View project details and contacts |
City, State (County) | San Diego, CA 92093 (San Diego County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Results, Request for Qualifications, Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,660,969 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Engineering Building Unit II (EBU II), located in the Muir College Quad of UCSD's main campus, is primarily a Laboratory/Research mid-rise facility comprised of 5 floors and a basement. The building is separated by 3 wings (2 laboratories & 1 office), which creates an open quad in the center. Supply air, at each wing, is generated by custom Air Handler Units (AHUs) and multiple fan coils throughout. Based on a recent evaluation of the supply air system multiple pieces of equipment have surpassed their useful life and in recent years have begun to fail impacting research within the facility. The primary objective of the project is to replace seven (7) pieces of HVAC equipment that are original to the building's current lifespan (29 years). Estimated project duration is 500 calendar days. Estimated construction cost: $2,000,000 Bid Security in the amount of ten percent (10%) of the Lump Sum Base Bid, excluding alternates, shall accompany each Bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |