Similar Projects
Maco Addition
Addition, Infrastructure - 7,800 SF
Conception
$4,200,000 CJ est. value
Shelby, NC 28150

Maco Addition
Addition, Infrastructure - 7,800 SF
Conception
$4,200,000 CJ est. value
Shelby, NC 28150

Intersection Realignment
Infrastructure
Design
$1,000,000 CJ est. value
Shelby, NC 28150

Intersection Realignment
Infrastructure
Design
$1,000,000 CJ est. value
Shelby, NC 28150

Kings Mountain Sewer Improvement
Infrastructure
Bidding
$300,000 CJ est. value
Kings Mountain, NC 28086

Fire Hydrant Replacement Project
Infrastructure
Bidding
$500,000 CJ est. value
Kings Mountain, NC 28086

Retrofitted ADA Ramp Replacement Project
Infrastructure
Post-Bid
Shelby, NC 28152

Rail Trail Phase 1A Construction Project
Infrastructure
Post-Bid
$900,000 est. value
Shelby, NC

Grading, Drainage, Paving and Structure
Infrastructure
Results
NC

On-Call Patching, Paving and Milling
Infrastructure
Results

Cumberland Drive Stormwater Replacements
Infrastructure
Construction
$18,458 CJ est. value
Shelby, NC 28150

Cannon 35
New Construction, Infrastructure
Pending Verification
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Cannon 35
New Construction, Infrastructure
Pending Verification
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Cannon 35
New Construction, Infrastructure
Design
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Asphalt Pavement Repair In Cleveland & Gaston Cos.
Term Contract, Infrastructure
Post-Bid
Less than $5,000,000 est. value

Last Updated 01/31/2023 11:08 AM
Project Title

Overlook and Trail Improvements at Crowders Mountain State Park - The North Carolina Parks and Recreation Authority

Physical Address View project details and contacts
City, State (County) Kings Mountain, NC 28086   (Cleveland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $1,750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope of work has not been disclosed. As of January 31, 2023, this project is in the conceptual phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to January 2024.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents