Similar Projects
Sewer and Water Drainage and Sidewalks - Phase 2
Infrastructure, Renovation
Conception
$1,000,000 CJ est. value
Thomasville, GA 31792

Sewer and Water Drainage and Sidewalks - Phase 2
Infrastructure, Renovation
Conception
$1,000,000 CJ est. value
Thomasville, GA 31792

Construction of City Bridge Improvements
Infrastructure
Design
$2,000,000 CJ est. value
Thomasville, GA 31792

Construction of City Bridge Improvements
Infrastructure
Design
$2,000,000 CJ est. value
Thomasville, GA 31792

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Landfill East End Road Resurfacing
Infrastructure
Post-Bid
$200,000 est. value
Thomasville, GA 31757

Resurfacing
Infrastructure
Results
$3,734,682 est. value
Metcalf, Ochlocknee, Thomasville, GA 31792

CDBG 21 Water Improvements
Infrastructure
Results
$1,948,291 CJ est. value
Ochlocknee, GA 31773

Troy Acoustics Manufacturing Facility
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Eason, GA 31757

2020 Capital Improvement - City of Thomasville
Infrastructure
Conception
$10,510,000 CJ est. value
Thomasville, GA 31792

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Construction/Paving of Wade Chastain Road
Infrastructure
Results
$793,691 CJ est. value
Coolidge, GA 31738

2022 City Bridge Repairs
Infrastructure
Post-Bid
$800,000 CJ est. value
Thomasville, GA 31792

Water Treatment Building Project
New Construction, Infrastructure
Results
$78,567 CJ est. value
Ochlocknee, GA 31773

Waste Water Treatment Facility Miscellaneous Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Thomasville, GA 31792

Last Updated 05/01/2023 03:09 PM
Project Title

Resurfacing Roads in Thomas County 2023

Physical Address View project details and contacts
City, State (County) Thomasville, GA 31757   (Thomas County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $4,842,937 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Thomas County Board of Commissioners is requesting bids for Resurfacing roads within Thomas County - Benton Road, McGarrah Road, Rupp Road, Stage Road, Beeline Road, Ione Road, Murphy Road, Martin Road, Twelve Mile Road, Harrell Road, Russell Road, Vicky Lane, and Plantation Woods Subdivision. No bid may be withdrawn after the closing time for receipt of bids for a period of (90) ninety days. Bonds: All bid forms must be accompanied by a Bid Bond in an amount not less than ten percent (10%) of the amount bid. The successful bidder, if awarded the contract, will be required to furnish a Performance Bond and Payment Bond each in the amount of one hundred percent (100%) of the contract amount. Contractor License: Any contractor submitting a bid must be a pre-qualified Georgia Department of Transportation Contractor. Furnish all materials, labor, and equipment to resurface approximately 15.39 miles of Benton Road, McGarrah Road, Rupp Road, Stage Road, Beeline Road, Ione Road, Murphy Road, Martin Road, Twelve Mile Road, Harrell Road, Russell Road, Vicky Lane, and Plantation Woods Subdivision, including traffic control and striping to Georgia DOT standards Minimum Requirements.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents