Similar Projects
New Auburn High School #2 - Auburn City Schools - 4257758
New Construction
Conception
$77,180,000 est. value
Auburn, AL 36830

Lauderdale County Elementary School Building
Addition
Design
$1,000,000 est. value
Rogersville, AL

Guntersville High School - Guntersville City Education Board
Addition, Demolition, Infrastructure
Design
$45,000,000 CJ est. value
Guntersville, AL 35976

Repair Maxwell AFB Elementary School Building 538A and 538A1
Renovation
Bidding
$25,000,000 CJ est. value
Montgomery, AL 36112

Repair Maxwell AFB Elementary School Building 538A and 538A1
Renovation
Bidding
$25,000,000 CJ est. value
Montgomery, AL 36112

Hankins Middle School Roof Replacement
Renovation
Sub-Bidding
$622,000 CJ est. value
Theodore, AL 36582

Sylvania High School Science Classroom Addition
Addition
Post-Bid
Sylvania, AL 35988

Renovation of Breakthrough Charter School
Renovation
Post-Bid
Marion, AL 36756

Science Lab Renovation for Geneva County High School
Renovation
Results
$414,500 est. value
Hartford, AL 36344

Addition to Existing Athletics for Hartselle High School
Addition
Results
Hartselle, AL 35640

A New Gymnasium at Zion Chapel High School
New Construction - 19,490 SF
Construction
Less than $4,325,000 est. value
Elba, AL 36346

9th Grade Academy Addition to Daphne High School
Addition
Construction
Daphne, AL 36526

Entrance Addition to Fairfield Board of Education
Addition, Demolition, Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Fairfield, AL 35064

Alterations and Renovations to Carroll High School
Renovation
Post-Bid
Ozark, AL 36360

Spanish Fort Elementary School
New Construction, Renovation - 143,000 SF
Results
$28,549,000 est. value
Spanish Fort, AL 36527

Last Updated 08/05/2022 03:09 PM
Project Title

Window Repair and Replacements for St. Clair County Schools Package B

Physical Address View project details and contacts
City, State (County) Springville, AL 35146   (Saint Clair County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Middle/Senior High School, Windows/Doors
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

WINDOW REPAIR AND REPLACEMENTS FOR ST. CLAIR COUNTY SCHOOLS Package B: Ragland High School, Springville Elementary School, Springville Middle School, and Springville High School Architect Job No. 21-97B Bids that are received via mail and not presented at the bid opening are to be considered non-responsive. It is the responsibility of the bidder to assure that bids are presented at the time of the bid. Contractors must notify the Awarding Authority if a bid is to be received by mail. A cashier's check or bid bond payable to St. Clair County Board of Education in an amount not less than five (5) percent of the amount of the proposal, but in no event more than $10,000.00, must accompany the bidder's proposal for each project. Performance and Payment Bonds and evidence of insurance as required in the bid documents will be required at the signing of the Contract. Drawings and specifications for the project may be examined at the Office of Lathan Associates Architects, P.C., 300 Chase Park South, Suite 200, Hoover, AL 35244 Prior to issuance of plans and specifications, all Contractors must provide evidence that they are properly licensed for the classification of work for this project. Evidence shall be in the form of a copy of current license clearly indicating all classifications, or sub-classifications, bid limits, license number; and expiration date. General Contractor Bidders may obtain digital copies of drawings and specifications from the Architect for each project upon receipt of Application for Bid. General Contractors will then be placed on Official Bidders List. Hard copy sets of drawings/ specifications will be available to General Contractors for purchase directly from the document printer: Alabama Graphics. Addenda and other proposal information will be issued only to holders of drawings and specifications distributed by the Architect and on the Official Bidders List. Release of contract documents to the bidder does not imply acceptance of the bidder's qualifications by the Owner or Architect. Bids received from General Contractors who are not on the Official Bidders List may not be accepted or opened. Lathan Associates Architects, P.C. makes no guarantee for plans and specifications obtained by Contractors and Vendors from sources other than the printed contract documents provided by their firm. Contractors and Vendors who base their pricing from contract documents obtained from other electronic sources, either in part or whole, do so at their own risk. Bids must be submitted on proposal forms furnished by the Architect or copies thereof, issued either with the original contract documents or by addendum. General Contractors shall not use Proposal Forms other than those provided in the contract documents. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975. The Bidder must display current General Contractor's License Number on the outside of the sealed envelope in which the proposal is delivered, or it will not be considered by the Architect or Owner. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interests of the Owner will thereby be promoted.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents