Similar Projects
RUSD 2022 Bond Projects - Future Phases
Renovation
Design
$34,500,000 est. value
MI

RUSD 2022 Bond Projects - Future Phases
Renovation
Design
$34,500,000 est. value
MI

Detroit Public Schools Community District 2022 Capital Improvements Series 1
Renovation
Sub-Bidding
$24,000,000 CJ est. value
Detroit, MI 48202

Detroit Public Schools Community District 2022 Capital Improvements Series 1
Renovation
Sub-Bidding
$24,000,000 CJ est. value
Detroit, MI 48202

2020 Bond High School-2 Plymouth Additions
Addition
Post-Bid
Plymouth, MI 48170

Exterior Renovations South High School
Renovation
Post-Bid
$100,000 est. value
Grosse Pointe Farms, MI 48236

Brown and Miller Elementary Schools Phase 3
Results
New Boston, MI 48164

2021 Central Office Building Renovation
Renovation
Results
Livonia, MI 48150

Detroit Public Schools Community District 2022 Capital Improvements Projects - Series 2
Renovation
Sub-Bidding
$24,000,000 CJ est. value
Detroit, MI 48226

Tipton Academy Charter School
Renovation
Post-Bid
Garden City, MI 48135

Remodeling Services for the Drew Academy
Renovation
Results
Ecorse, MI 48229

Oakley W Best Middle School Mechanical Equipment Replacement
Renovation
Sub-Bidding
$260,000 CJ est. value
Dearborn Heights, MI 48125

BP HS-1 Salem High School Auditorium
Renovation
Post-Bid
Canton, MI 48187

SCS 2020 Bond - Anderson HS Natatorium, Lobby and Weight Room - BP2
Renovation
Results
Southgate, MI 48195

AHS(Annapolis High School) Mechanical Equipment Replacement
Renovation
Sub-Bidding
$170,000 CJ est. value
Dearborn Heights, MI 48125

Last Updated 08/09/2022 12:05 AM
Project Title

Livonia Career Technical Center Renovations and Robotics Addition - Bid Pack 3A

Physical Address View project details and contacts
City, State (County) Livonia, MI 48150   (Wayne County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Construction Manager - 06/30/22
Owner View project details and contacts
Architect View project details and contacts
Description

Each Bid must be accompanied by a Bid security in an amount of not less than 5% of the total base Bid sum, pledging that the Bidder will enter into a Contract with the Construction Manager under the terms stated in the Bid Documents. Bid Bonds shall be issued by a bonding company meeting the requirements as described in Section 006113 Performance and Payment Bond. Bid security may also be in the form of certified check made out to the School District. School District Board of Education reserves the right to accept or reject any and all Bids, either in whole or in part, to waive any informalities or irregularities therein, or to award the contract to other than the Bidder(s) submitting the best financial Bid (low Bidder), in its sole and absolute discretion. All questions during the bidding period shall be referred to Clark Construction Company via email to: CONTACT: Andrew Holewinski EMAIL: aholewinski@clarkcc.com Please get pre-qual with Clark Construction Company on the same website if you are not already pre-qualified.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents