Project Title | 2023 Terminal 2 and Outbuildings Miscellaneous Modifications |
Physical Address | View project details and contacts |
City, State (County) | Saint Paul, MN 55111 (Hennepin County) |
Category(s) | Heavy and Highway, Transportation |
Sub-Category(s) | Airline/Passenger Terminal, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $592,724 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Airport Location: Minneapolis-St. Paul International Airport 1. General Construction work for the project includes: Selective demolition of existing construction, renovations and repairs including: concrete work; casework; door operators; acoustical ceilings, painting and finishes; and other miscellaneous work. 2. Mechanical Construction work for the project includes: Mechanical demolition; mechanical system, and plumbing modifications. 3. Electrical Construction work for the project includes: Electrical demolition; power distribution systems; fire alarm, and communications systems. Each bid shall be accompanied by a "Bid Security" in the form of a certified check made payable to the MAC in the amount of not less than five percent (5%) of the total bid, or a surety bond in the same amount, running to the MAC, with the surety company thereon duly authorized to do business in the State of Minnesota. Such Bid Security to be a guarantee that the bidder will not, without the consent of the MAC, withdraw its bid for a period of (70) days after the opening of bids, and, if awarded the Contract, will enter into a contract with the MAC, and in connection therewith, give Performance and Payment Bonds as required by law and on forms furnished to the Contractor by the MAC. In the event the Bidder fails to enter into a Contract, the amount of the certified check will be retained or the bond enforced by the MAC. he goal of the MAC for the utilization of Targeted Group Businesses on this project is 10%. |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |