Similar Projects
Y1NB--FY21: NRM TIER 2 (PROJ: 675-21-103) Replace Lake Baldwin Cooling Towers
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Orlando, FL 32803

Michigan Campus Juvenile Justice Center HVAC and Roof Replacement
Alteration
Bidding
$2,300,000 est. value
Orlando, FL 32806

Orange County Cooperative Extension Exhibit Hall HVAC Replacement
Alteration
Bidding
$428,100 est. value
Orlando, FL 32812

Removal and Replacement of 75 A/C Rooftop Condensing Units at Maxwell Terrace Apartments - Building 1
Post-Bid
Orlando, FL 32805

HVAC System Replacement, Roof Replacement, Supply and Install Solar Energy System at the OHA Executive Office
Post-Bid
Orlando, FL 32803

Replacement In-Kind of one (1) - Sixty (60) Ton Chiller at the Pompano Turnpike Operations Center
Results
Ocoee, FL 34761

A/C Removal ATaS Lab NAWCTSD
Results
Orlando, FL 32826

BSL 3 Laboratory HVAC and Controls Renovation
Renovation, Alteration
Bidding
Kissimmee, FL 34741

Wolf Lake Middle School HVAC and Controls Upgrades
Post-Bid
$1,600,000 est. value
Orlando, FL 32800

Internal Operations Centre I (IOC I) Communications Room HVAC Improvements
Results
Less than $100,000 est. value
Orlando, FL 32801

Portable AC Units
Alteration
Bidding
Orlando, FL

Air Ductwork Cleaning Services
Post-Bid
Orlando, FL 32827

Data Center HVAC Preventive Maintenance and Repairs Services
Term Contract
Results
Orlando, FL 32827

N041--Sources Sought Notice Install Cooling Tower Gearbox
Post-Bid
Orlando, FL

Preventative Maintenance and Operations of Air Compressors and Dryers for the Orange County Convention Center
Term Contract
Results
FL

Last Updated 07/14/2021 09:29 AM
Project Title

Construction Management at Risk for Wekiva and West Orange High School HVAC Renovations Capital Renewal Project

Physical Address View project details and contacts
City, State (County) Apopka, Winter Garden, FL 32703   (Orange County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

LDB Participation goal - 10%. VBE Participation goal - 3% Wekiva HS: Renovation of the campus heating, ventilating and air conditioning (HVAC) system, including but not limited to refurbishment or replacement of existing air distribution equipment and the building automation system, and selected equipment and piping replacements in the central energy plant (CEP). West Orange HS: Renovation of the campus heating, ventilating and air conditioning (HVAC) system, including but not limited to refurbishment or replacement of existing air handling units (AHU); replacement of exhaust fans, dampers and actuators, and Building Automation System (BAS) controls; and replacement of select other HVAC system equipment as needed to comply with OCPS Design Guidelines

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents