Similar Projects
Chaffee Property Development
New Construction, Infrastructure
Conception
$250,000 CJ est. value
Fort Smith, AR 72901

RFQ Engineering - Garrison Avenue Complete Street and Towson Avenue Corridor Plan
Infrastructure
Conception
$450,000 CJ est. value
Fort Smith, AR 72901

66th Street Duplex
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Fort Smith, AR 72903

Concrete Pad
Infrastructure
Design
$250,000 CJ est. value
Fort Smith, AR 72903

New Splash Pad for Bell Park
Infrastructure - 485 SF
Bidding
$300,000 CJ est. value
Greenwood, AR 72936

Batting Cage and Pavilion
Infrastructure
Bidding
$20,000 CJ est. value
Hackett, AR 72937

RFP - Nonexclusive Professional and Consultant Services
Term Contract
Post-Bid
Fort Smith, AR 72901

May Branch Railroad Biking and Walking Trail - Phase I
Infrastructure
Post-Bid
$400,000 CJ est. value
Fort Smith, AR 72904

Sebastian CO. Overlay No. 2
Infrastructure
Results
AR

Polymer Resin for Polymer Overlay
Term Contract
Results

Construction Services to Build Two (2) Single-family Transitional Homes
New Construction, Infrastructure
Construction
$700,000 CJ est. value
Fort Smith, AR 72901

Wells Lake Cottages
New Construction, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Fort Smith, AR 72904

2020 Streets Maintenance - City of Fort Smith
Infrastructure
Pending Verification
$519,800 CJ est. value
Fort Smith, AR 72904

Towson Avenue - Garrison to Zero Street - City of Fort Smith
Infrastructure
Conception
$2,000,000 CJ est. value
Fort Smith, AR 72901

Riverfront Mixed-Use Development
Demolition, New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Fort Smith, AR 72904

Last Updated 10/08/2023 11:33 PM
Project Title

Hwy. 10 - Hwy. 96 (Greenwood Bypass) (S)

Physical Address View project details and contacts
City, State (County) Greenwood, AR 72936   (Sebastian County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Purpose of This Project is to Construct Approximately 1.193 Miles of the Greenwood Bypass on Highway 10 in Sebastian County. This Project Consists of Clearing and Grubbing, Removal and Disposal Items, Earthwork, Aggregate Base Course, Cement Treated Base Course, Achm Base, Binder, and Surface Courses, Cold Milling Asphalt Pavement, Achm Patching of Existing Roadway, Portland Cement Concrete Pavement, Approach Slabs and Gutters, Maintenance of Traffic, Concrete Ditch Paving, Minor Drainage, Erosion Control, Concrete Islands, Concrete Walks, Curb and Gutter, Traffic Signal Items, Pavement Marking, Construct Two Continuous W-beam Unit Bridges (Total Length 740.56'), Construct Three Continuous Plate Girder Unit Bridges (Total Length 960.16') and Misc. Items. Routes: 10 Sections: 0 & 1 County: Sebastian Length: 1.193 Miles in Length. Question Deadline 10/25/2023 at 1:30 PM CT Questions pertaining to projects during the advertisement period should be addressed to the Program Management Division at pmd@ardot.gov. The deadline to submit a question is the Wednesday prior to the scheduled letting date. A question submitted after the close of business on the Wednesday prior to the scheduled letting date may not receive a response. In Order to Have a Bid Considered, Contractors Must Furnish a Proposal Guaranty Consisting of Either a Bidder's Bond or a Certified or Cashier's Check in the Amount of Five Percent (5%) of the Total Amount Bid. in Order for a Bond to Be Acceptable to the Department, the Company Issuing the Bond Must Be Named in the Department of Treasury Listing of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies. the Underwriting Limitation of the Bonding Company Shall Be Adhered to. Any Excess (Between the Face Amount of the Bond and the Underwriting Limitation) Shall Be Protected by Reinsurance Provided by an Acceptable Reinsuring Company. These Contracts Are Subject to Normal Prequalification, Licensing and Bonding Requirements, Applicable Labor Laws, Non-discrimination Provisions, Wage Rate Laws and Other Federal Laws Including the Fair Labor Standards Acts of 1938. the Work Hours Act of 1962 and Title Vi of the Civil Rights Act of 1964 Also Apply. The Arkansas Department of Transportation Complies With All Civil Rights Provisions of Federal Statutes and Related Authorities That Prohibited Discrimination in Programs and Activities Receiving Federal Financial assistance. Therefore, the Department Does Not Discriminate on the Basis of Race, Sex, Color, Age, National Origin, Religion, or Disability, in the Admission, Access to and Treatment in Department's Programs and Activities, as Well as the Department's Hiring or Employment Practices. Complaints of Alleged Discrimination and Inquiries Regarding the Department's Nondiscrimination Policies May Be Directed to Joanna P. Mcfadden, Section Head - Eeo/dbe (Ada/504/title Vi Coordinator), P. O. Box 2261, Little Rock, Ar 72203, (501) 569-2298, (Voice/tty 711), or the Following Email Address: Joanna.mcfadden@ardot.gov. This Proposal Contains the Job Special Provision Site Use (a+c Method)-calendar Day Contract for Bidding in Which the Bidder Will Determine the Number of Calendar Days to Complete the Project. The Percentage Goal for Disadvantaged Business Enterprise (Dbe) Participation in This Project is 7.0%. The Department Reserves the Right to Reject Any or All Bids and to Waive Any Formalities. ARDOT - Hwy. 10 - Hwy. 96 (Greenwood Bypass) (S)

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents