Similar Projects
Wastewater Treatment Plant Project
New Construction
Bidding
Taylor, AL

Old Towne Raw Water Conversion
New Construction
Bidding
Daphne, AL

Contract 1. Wastewater Treatment System Improvements
Post-Bid
Mosses, AL 36040

Contract 2. Wastewater Collection System Expansion
Post-Bid
Mosses, AL 36040

Phosphorous Control Chemical Addition Improvements for the Five Mile Creek, Turkey Creek, Prudes Creek and Warrior WRFs
Results
Fultondale, AL 35068

Dye Creek Wastewater Treatment Plant Influent Screen Improvements
Results
Less than $709,500 est. value
Pell City, AL 35128

Construction of the Wastewater Treatment Plant Improvements
Renovation
Construction
$1,866,000 est. value
Priceville, AL

Wastewater Treatment Plant Upgrades
Post-Bid
Less than $1,500,000 est. value
West Blocton, Woodstock, AL

Mallard Fox West WWTP
Results
Decatur, AL 35603

Phase II at Minooka Park for an Alternative Wastewater Treatment System
Post-Bid
Clanton, AL 35045

Replacement of Dixie Manor Waste Water Treatment Plant
Results
Pinson, AL 35126

Steel Fabricated Wastewater Treatment System
Post-Bid
Alexandria, AL 36250

CC Williams Digester Seal Replacements and Structural Repairs
Results
Less than $200,000 est. value
Mobile, AL 36603

Contract No. 2 - Laney Lift Station Upgrade of the Tallassee WWTP and Collection System Improvements
Post-Bid
Tallassee, AL 36078

Custom Reactivation Of Granular Activate Carbon
Results
Less than $162,900 est. value
Shelby, AL

Reported 12/09/2021 11:07 AM
Project Title

UV Replacement and Miscellaneous Improvements

Physical Address View project details and contacts
City, State (County) Birmingham, AL   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,318,155
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Modifications at the Turkey Creek WRF will include modifications and improvements to the following areas: UV Building, installation of new UV equipment in the existing structure including new UV banks electrical and controls and modifications to the existing structure as required. Headworks, refurbishment of two climber screens and the replacement of the existing the screenings conveyor. Aeration Basins, installation of new dissolved oxygen and suspended solids probes and analyzers. Clarifiers, repair of spalling concrete at Clarifier 2 and 4, replacement of existing drives for Clarifier 1 and 2, inspection of Clarifiers 1, 2, 3 and 4 and replacement of corroded metals as required. Replacement of SCADA PLC equipment and associated programming at the Generator Building, RAS/WAS Pump Station Building and Solids Pump Station Building. Recoating of selected surfaces and miscellaneous improvements as shown on the Drawings. Modifications at the Prudes Creek WRF will include modifications and improvements to the following areas: Installation of new concrete UV structure and installation of new UV equipment. Headworks, replacement of the existing grit removal system and refurbishment of the process screw pumps. Clarifiers, replacement of drive control units for Clarifiers 1 and 2. Filters, replacement of pneumatically operated valves with electrically operated valves and replacement of the filter control panel PLC. Effluent Parshall Flume, installation of aluminum covers. Plant Drain Pump Station, conversion of the the existing plant drain pump station to a manhole and installation of a new plant drain pump station including wetwell, valve vault, pumps, piping and controls. RAS/WAS Pump Station, replacement of the existing submersible RAS/WAS pumps, demolition of local pump panel and installation of new RAS/WAS MCC at the Maintenance Building. Administration Building, convert existing storage room to Laboratory demolition, new doors and windows, lights HVAC modifications and finishes. Maintenance Buildings, convert existing laboratory to a storage area, including replacement of doors and installation of new HVAC units. Demolition of existing and installation of new RAS and WAS flow meters and vaults. Replacement of SCADA PLC equipment and associated programming at the Generator Building, Maintenance Building, Headworks Building and Plant Water Pump Station Building. Recoating of selected surfaces and miscellaneous improvements as shown on the Drawings. Modifications at the Warrior WRF will include modifications and improvements to the following areas: UV Building, installation of new UV equipment in the existing structure including new UV banks electrical and controls and modifications to the existing structure as required. Resurfacing of the asphalt plant entrance road. Aeration Basins, installation of new dissolved oxygen and suspended solids probes and analyzers. Digesters, installation of new dissolved oxygen and suspended solids probes and analyzers. Clarifiers, Clarifiers, replacement of drives for Clarifiers 1 and 2. Replacement of SCADA PLC equipment and associated programming at the Digester Building, RAS/WAS Pump Station Building, Influent Pump Station Building and UV Building. Recoating of selected surfaces and miscellaneous improvements as shown

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents