Similar Projects
Sawmill Mixed Use Future Phases
New Construction, Infrastructure
Conception
$200,000,000 CJ est. value
Summerville, SC 29483

Intersection Improvement S-169 (Von Ohsen Rd)/S-881 (Lincolnville Rd)
Infrastructure
Conception
$2,100,000 CJ est. value
Summerville, SC 29485

Downtown Nexton Mixed-Use
New Construction, Infrastructure - 310,000 SF
Design
$100,000,000 CJ est. value
Summerville, SC 29483

Rangewater North Maple Street
New Construction, Infrastructure
Design
$65,000,000 CJ est. value
Summerville, SC 29483

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Intersection Improvements - US 176(Berkeley County)
Infrastructure
Bidding
$2,100,000 CJ est. value
Summerville, SC 29483

Harris Teeter Fuel Center #355 / Summerville
Demolition, New Construction, Infrastructure, Renovation
Post-Bid
$800,000 CJ est. value
Summerville, SC 29485

Proposed Mitigation Plans for SC-91 (Berlin Myers Parkway) Phase 3
Infrastructure
Post-Bid
$200,000 CJ est. value
Summerville, SC 29483

Berkeley Dorchester Interconnect Division II
New Construction, Infrastructure
Results
Ridgeville, SC

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

The Ponds - Phase 6
New Construction, Infrastructure
Construction
$66,000,000 CJ est. value
Summerville, SC 29483

Coastal Crossroad Logistics Center Phase 1 and 2
New Construction, Infrastructure - 2,500,000 SF
Pending Verification
$200,000,000 CJ est. value
Summerville, SC 29483

BID Group Wood Processing Expansion
Addition, Demolition, Infrastructure
Pending Verification
$10,600,000 CJ est. value
Saint George, SC 29477

FlexCold Patriot Boulevard Cold Storage Warehousing / North Charleston
New Construction, Infrastructure
Conception
$49,900,000 CJ est. value
Summerville, SC 29485

Roper St. Francis Outpatient Facility at Sawmill
New Construction, Infrastructure - 40,000 SF
Design
$50,000,000 CJ est. value
Summerville, SC 29483

Last Updated 03/17/2023 10:05 AM
Project Title

Thorpe Road Culvert Replacement

Physical Address View project details and contacts
City, State (County) Summerville, SC 29483   (Dorchester County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $572,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Description: Work on the project includes the replacement of an existing culvert at the Thorpe Street crossing of Green Bay Branch with a 5'-1" x 16'-2" CONSPAN Arch Culvert, removal of approximately 330 linear feet of existing 36" and 48" storm pipe and structures, and stream channel cleanup and re-establishment along the approximate 900 LF of project limits. Project will also include the relocation of an 8" gravity sewer line with manholes and 6" force main to accommodate the new culvert. Thorpe Street will also have to be repaved for portion removed to install the proposed culvert. If you have any questions regarding this solicitation, please contact Ann-Marie Fraser at afraser0102@yahoo.com.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents